Inspections for the day of: Wednesday, April 7, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00010 Tracking Control4/7/20104/7/20104/7/2010 2:42:41 PMPFAIL
Verbal to RP:
No later than 4/13/10 we must see that at the north end of project area either block off access and or install a stabilized construction exit. Keep up with sweeping. Also told RP to figure out how they will be stabilizing the channel that connects the three ponds. We also cannot have a active water flow in the channel until the time of achieving final stabilization with in the whole channel. Will follow up on 4/13/10AM.
ESC10-00035 BMP Violation4/1/20104/7/20104/7/2010 1:10:27 PMACANC
ESC10-00181 BMP Violation4/5/20104/7/20104/7/2010 1:09:56 PMAPASS
ESC10-00151 Tracking Control4/5/20104/7/20104/7/2010 1:09:47 PMAPASS
ESC10-00233 BMP Violation4/5/20104/7/20104/7/2010 1:09:35 PMAPASS
ESC09-00733 Random Inspection4/7/20104/7/20104/7/2010 10:03:01 AMAPASS
ESC10-00008 Site Preparation4/1/20104/7/20104/7/2010 10:00:41 AMANR
ESC05-00258 Aging Inspection4/7/20104/7/20104/7/2010 10:00:22 AM DONE
ESC05-00258 DOC - Permit Finaled4/7/20104/7/20104/7/2010 10:00:17 AMPPASS
ESC10-00052 Site Preparation4/7/20104/7/20104/7/2010 9:41:58 AM NR
ESC10-00194 Site Preparation4/7/20104/7/20104/7/2010 8:20:06 AM NR
ESC10-00195 Site Preparation4/7/20104/7/20104/7/2010 8:19:59 AM NR