Inspections for the day of: Thursday, April 7, 2011.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-01531 ELE-Aging Inspection4/7/20114/7/20114/12/2011 2:58:44 PM DONE
still under construction
ELE10-01532 ELE-Aging Inspection4/7/20114/7/20114/11/2011 9:09:55 AM DONE
still under construction
ESC10-00107 Aging Inspection4/7/20114/7/20114/7/2011 2:42:37 PM CANC
ESC10-00107 Site Final4/7/20114/7/20114/7/2011 2:42:21 PMPPASS
site clean landscaping in final ok
ELE11-00574 Electrical Rough-In4/7/20114/7/20114/7/2011 2:20:00 PMPPASS
Hi Daryl, could you please call me a 1/2 hour before you get to this job so that I can call and get someone to let you in. Thanks I appreciate it.

Mark Phone #: ###-#### >> Inspection requested via web by Mark Hennequin rough-in ok bathroom remodel with stackable washer/dryer circuits
ELE10-02676 Electrical Rough-In4/7/20114/7/20114/7/2011 1:45:06 PMPPASS
This is a rough electrical inspection of the Basement area and the Main Floor Stairwells. Contact on the job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok basement & west stairwell ok cover
ELE11-00553 Final4/7/20114/7/20114/7/2011 1:10:25 PMPPASS
Dave Phone #: ###-#### final ok
ELE11-00659 Electrical Rough-In4/7/20114/7/20114/7/2011 12:51:22 PMPPASS
call 1/2 hr before//Mike ###-#### rough-in ok listed material
ELE11-00202 Electrical Rough-In4/7/20114/7/20114/7/2011 12:42:02 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Danny Pugil rough-in ok cover under counter receptacles
ELE11-00265 Electrical Rough-In4/7/20114/7/20114/7/2011 12:17:48 PMPPASS
Upper level hard lid ceiling only. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo rough-in ok hard lid upper floor area
ELE11-00616 Rough-In Permanent Service4/6/20114/7/20114/7/2011 10:22:25 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Josh Craig rough-in p/s u/g n ok
ELE11-00615 Rough-In Permanent Service4/6/20114/7/20114/7/2011 9:57:54 AMAPASS
>> Inspection requested via web by Josh Craig rough-in p/s u/g n ok
ELE11-00648 Electrical Rough-In4/6/20114/7/20114/7/2011 9:43:30 AMAPASS
Ron Phone #: ###-#### rough-in p/s u/g n ok
ELE10-02771 Final4/6/20114/7/20114/7/2011 9:19:49 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Brad Girard final ok
ELE11-00483 Electrical Rough-In4/6/20114/7/20114/7/2011 8:56:51 AMAPASS
Please call Ken Reed (###-#### ) 15 minutes before so he can meet you there. Thanks Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot maseter bedroom & walkin closet
ELE10-01480 Final4/6/20114/7/20114/7/2011 8:45:21 AMAPASS
Please final the Permit. It was noted in the Perm Service request to Final this at the same time if it was ok. Thank you. Phone #: ###-#### >> Inspection requested via web by Clint Tate final ok nice job!
ELE11-00618 Electrical Rough-In4/6/20114/7/20114/7/2011 8:35:22 AMAPASS
Please inspect U.G. to Gen Pad on east side of Channel 2 building. Please note- we are not switching the nuetral, therefore not a seperatley derived system. Also- the cutout area will be fenced ( no vehicle traffic) and will be poured back a minimum of 6" concrete. Thanks! Phone #: ###-#### >> Inspection requested via web by Loren Ramsey rough-in ok cover trench