ELE15-00925
| Conference | 4/6/2015 | 4/7/2015 | 4/7/2015 3:34:07 PM | P | DONE |
|
|
I need to meet with an inspector at 3pm 4/7/2015 with the builder and home owner to see if we can build a swimming pool next to the meter base. Phone #: ###-#### Inspection requested via web by Kotton Corder Discussed with contractor required clearances from service gear to inground pool
|
ELE15-00681
| Electrical Rough-In | 4/7/2015 | 4/7/2015 | 4/7/2015 2:34:11 PM | P | PASS |
|
|
Equipotential bonding plane Phone #: ###-#### Inspection requested via web by Lars Johnson rough-in ok cover
|
ELE15-00452
| Final | 4/7/2015 | 4/7/2015 | 4/7/2015 2:19:50 PM | P | PASS |
|
|
Charlie Phone #: ###-#### final ok
|
ELE14-03185
| Final | 4/6/2015 | 4/7/2015 | 4/7/2015 1:57:35 PM | A | PASS |
|
|
Please call Bill ahead at ###-#### for entry info. Phone #: ###-#### Inspection requested via web by Rhonda Yoast final ok
|
ELE15-00374
| Electrical Rough-In | 4/6/2015 | 4/7/2015 | 4/7/2015 1:36:37 PM | P | PASS |
|
|
Mark Phone #: ###-#### correction done, rough-in ok cover master bathroom
|
ELE15-00450
| Electrical Rough-In | 4/7/2015 | 4/7/2015 | 4/7/2015 1:00:01 PM | P | PASS |
|
|
Underground for cover - Brian Phone #: ###-#### rough-in ok cover trenches as per highlighted and dated 4/07/15 on plans
|
ELE15-00923
| Electrical Rough-In | 4/6/2015 | 4/7/2015 | 4/7/2015 12:59:39 PM | P | PASS |
|
|
Need approval to cover trench between house and garage Phone #: ###-#### Inspection requested via web by Alan Lusk rough-in ok cover
|
ELE14-01896
| Final | 4/6/2015 | 4/7/2015 | 4/7/2015 10:27:41 AM | A | FAIL |
|
|
Matt Foster is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen NEC 334.12(B)(4) NM shall not be installed in wet or damp locations, wiring for mini split systems.
|
ELE15-00639
| Final | 4/6/2015 | 4/7/2015 | 4/7/2015 9:06:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt final ok
|
ELE15-02131
| Electrical Rough-In | 4/7/2015 | 4/7/2015 | 4/7/2015 12:00:00 AM | A | FAIL |
|
|
Rough in north exterior wall in clubhouse, walls only. Phone #: ###-#### Inspection requested via web by Rafael Castillo Insulation and sheet rock installed prior in cover inspection on north wall og clubhouse, Remove insulation and sheet rock to complete cover inspection. Stop work on electrical installation of East Wing till roofing envelope 100% completed, do to exccessive amount of rain water still getting in below.
|