Inspections for the day of: Tuesday, April 7, 2015.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00212 General Inspection4/7/20154/7/20154/7/2015 4:14:05 PM PASS
WIP. Groundwork phase of construction is complete. Minimal trackout, no discharges or runoff from site. No corrections at this time.
ESC14-01030 General Inspection4/7/20154/7/20154/7/2015 3:36:06 PMPPASS
Warehouse frame is being built. Silt fence installed along north of protect to protect hillside vegetation. No trackout, permits posted. Approved.
ESC11-00525 BMP Violation4/7/20154/7/20154/7/2015 3:15:27 PMPFAIL
Slurry from concrete cutting/work has left residual dust in the gutter on Woodcarver, no discharges to the MS4 (inlet bag installed)

Request to Brighton homes to require contractors to clean up.
ESC12-01066 Conference4/6/20154/7/20154/7/2015 2:18:32 PMADONE
Steed Construction will have someone grab the drop inlet bags.
ESC13-00524 General Inspection4/7/20154/7/20154/7/2015 1:54:03 PMPPASS
Hillside slopes in Hackberry have been recently hydroseeded/tacified. The drainage channel along Bogus Basin was also hydroseeded. Coverage looks good. No hillside erosion or areas of significant sediment runoff. Permit open to monitor stabilization of hillsides.
ESC14-00684 General Inspection4/7/20154/7/20154/7/2015 1:47:06 PM PASS
Home is complete, landscaped, and hillsides surrounding home have been hydroseeded. ESC permit conditions satisfied.
ESC14-00684 DOC - Permit Finaled4/7/20154/7/20154/7/2015 1:46:11 PMPPASS
ESC14-00239 General Inspection4/7/20154/7/20154/7/2015 11:50:16 AM PASS
Site perimeter is clean and free of trackout or loose sediment accumulations. WIP on interior - exterior not yet stabilized but controlled access have prevented trackout. No discharges or spills observed. Permit is posted.
ESC12-00130 General Inspection4/7/20154/7/20154/7/2015 11:47:06 AM PASS
River's Edge apartment complex is in progress. Silt fence between project and Greenbelt is trenched in and in good condition. Royal Blvd is currently closed for utility work - will need to be swept upon completion. No corrections at this time.
ESC14-00751 General Inspection4/7/20154/7/20154/7/2015 11:20:39 AM NR
Pre-construction meeting scheduled for tomorrow. No activity or earth work occuring at site yet.
ESC14-00588 General Inspection4/7/20154/7/20154/7/2015 10:28:32 AM PASS
The District at Parkcenter has not yet started. No BMPs or permit signage. Will check for start time and schedule site prep inspection. Multilbuilding complex with ESC14-00588 to ESC14-00602
ESC15-00290 Site Preparation4/6/20154/7/20154/7/2015 10:01:34 AMAPASS
Any questions please call Erby. Thanks. Phone #: ###-#### Inspection requested via web by Joshua Edwards

Permit posted, BMPs in Mill District Square are in good condition. Approved for construction.
ESC15-00223 Site Preparation4/6/20154/7/20154/7/2015 10:00:04 AMAPASS
Any questions please call Erby. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwards

ESC14-00798 General Inspection4/7/20154/7/20154/7/2015 9:40:14 AM PASS
Accessible ramps and interior construction complete. No construction acitiviity or disturbed area remaining at site. ESC permit finaled.
ESC14-00798 DOC - Permit Finaled4/7/20154/7/20154/7/2015 9:39:25 AMPPASS
ESC13-00930 General Inspection4/7/20154/7/20154/7/2015 9:11:24 AM PASS
ESC14-00853 Aging Inspection4/7/20154/7/20154/7/2015 8:40:51 AM PASS
ESC14-00781 Conference4/6/20154/7/20154/6/2015 4:40:57 PMACANC
data entry error
ESC13-01025 Site Final4/2/20154/7/20154/6/2015 11:34:06 AMAPASS
check to see if Tahoe Homes on Honeycomb are all landscaped and streets cleaned....


Home is complete, landscaped, and recently sold. Landscaping work from last weekend was adequately cleaned. ESC permit finaled.