PLM97-00836
| INSP - Sprinkler & Backflow | 4/7/1997 | 4/8/1997 | 4/9/1997 12:00:00 AM | A | PASS |
|
|
04/08/97 334 -
|
PLM97-00867
| INSP - Water lines FINAL | 4/8/1997 | 4/8/1997 | 4/9/1997 12:00:00 AM | P | PASS |
|
|
04/08/97 334 -
|
PLM97-00870
| INSP - Plumbing Rough-in | 4/8/1997 | 4/8/1997 | 4/9/1997 12:00:00 AM | P | FAIL |
|
|
04/08/97 334 - 1 W/C 1 LAV 1 SINK 1 W/H 1 W/B 1 TUB/SHOWER wrong fixture count , water test failed , foam sprayed on questpex ,pipi and some kind of silicone on stairs tub lines
|
PLM97-00873
| INSP - Water lines FINAL | 4/8/1997 | 4/8/1997 | 4/9/1997 12:00:00 AM | P | PASS |
|
|
04/08/97 334 - after 3:30
|
PLM97-00874
| INSP - Plumbing Rough-in | 4/8/1997 | 4/8/1997 | 4/9/1997 12:00:00 AM | P | FAIL |
|
|
04/08/97 334 - meet arround 3 he said he would call you to set time meridian plumbing had corrections on groundwork, now we are in roughin s with R and D and J Bar K is the general ,need to test rain drains above floor, waste and water test ok gz,merdian plumbing needs to take care of their part before ri , gz
|
PLM97-00861
| INSP - Sewer line FINAL | 4/7/1997 | 4/8/1997 | 4/8/1997 12:00:00 AM | A | PASS |
|
|
04/08/97 334 -
|
PLM96-03635
| INSP - Water lines | 4/7/1997 | 4/8/1997 | 4/8/1997 12:00:00 AM | A | PASS |
|
|
04/08/97 334 -
|
PLM97-00828
| INSP - Plumbing Rough-in | 4/7/1997 | 4/8/1997 | 4/8/1997 12:00:00 AM | A | PASS |
|
|
04/08/97 334 -
|