ELE02-00981
| Permanent Service | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | FAIL |
|
|
###-#### called notice posted need inside to electrical left message 4/8/2002 11:20:33 AM
|
ELE02-00969
| Rough-In Permanent Service | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | FAIL |
|
|
###-#### bev cor. posted called 314.43, 250.32 (B)(1) 300.4 1 1/4, grd heater cans 4/8/2002 10:52:24 AM
|
ELE02-00977
| Permanent Service | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### call first
p/s u/g new ok 4/8/2002 10:00:49 AM
|
ELE02-00980
| Rough-In Permanent Service | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### r/i ok
p/s o/h new ok 4/8/2002 2:08:10 PM
|
ELE02-00673
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:44:50. Contact: .
no final r/i for u/g , needs to install bond bushings where RE washers are use at both 200 amp disconnects 4/8/2002 3:07:43 PM
|
ELE02-00983
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 08:29:26. Contact: ###-####. ok 4/8/2002 2:35:14 PM
|
ELE02-00599
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
fn kay ###-#### ok 4/8/2002 4:34:19 PM
|
ELE02-00967
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | CANC |
|
|
fn insp--mike cole ###-####-call 1st before insp-secured area
|