MEC01-03163
| Pressure Test | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:09:47. Contact: ###-####. 60" test and low test are both ok 4/8/2002 11:23:24 AM
|
MEC02-00745
| Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
roof top units\###-#### Ben roof top units ok...all regs and exhaust ok 4/8/2002 11:24:37 AM
|
MEC02-00612
| Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
partial ceiling cover ok...will check rtu's at final 4/8/2002 10:41:01 AM
|
MEC02-00899
| Final | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 15:45:51. Contact: ###-####....parkcenter..right on mallard 4/8/2002 8:17:24 AM need fresh air to rtu...all exhausts to be 3' above f/a intake 4/8/2002 10:47:35 AM
|
MEC02-00612
| Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### J R CALL 20MINUTES BEFORE GOING OUT
|
MEC02-00934
| Pressure Test | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
pres test jerry ###-#### low pressure from meter to shop ok 4/8/2002 6:35:07 PM
|
MEC02-00841
| Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PART |
|
|
###-#### ALAN waiting on engineer for dryer vent approval 4/9/2002 9:44:50 AM
|
MEC02-00615
| Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### BEV
|
MEC02-00881
| Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
LARRY ###-####
|
MEC02-00881
| Pressure Test | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
LARRY ###-####
|