BLD02-00609
| BLD-Footing | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PART |
|
|
###-#### 90% ready at time of inspection. 4/8/2002 11:24:03 AM
|
MEC02-00281
| Final | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
james -###-#### fn
|
MEC02-00625
| Final | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
fn james ###-####
|
BLD01-03153
| BLD-Final | 4/5/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 15:36:00. Contact: . C/N on site 4/8/2002 9:49:40 AM
|
MEC02-00922
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 06:48:44. Contact: ###-####. Gas fireplace 4/8/2002 11:23:30 AM
|
MEC02-00328
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:12:10. Contact: ###-####.
|
BLD02-00613
| BLD-Foundation | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 420 On 4/8/2002 8:37:25 AM wip 4/8/2002 8:38:12 AM
|
BLD01-03174
| BLD-Framing/Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
###-#### Ok to insulate 4/8/2002 2:35:11 PM
|
MEC02-00944
| Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | FAIL |
|
|
###-#### c/n exhaust ducts to restrictive by the straps--B-vent to be fastened at the chase on the second floor. 4/8/2002 3:16:15 PM
|
MEC02-00944
| Pressure Test | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-00328
| Final | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 4/8/2002 1:36:38 PM
|
BLD02-00447
| BLD-Wall cover | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 4/8/2002 2:41:23 PM
|
BLD02-00440
| BLD-Framing/Rough-in | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:33:07. Contact: .SHEAR--ok to side 4/8/2002 4:08:50 PM
|
BLD02-00360
| BLD-Other | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:38:04. Contact: .Shear 4/8/2002 2:35:34 PM
|
BLD02-00613
| BLD-Foundation | 4/8/2002 | 4/8/2002 | 4/8/2002 12:00:00 AM | P | CANC |
|
|
###-#### CHRIS 4/8/2002 8:38:54 Am-Foundation inspection already done. 4/8/2002 1:37:14 PM
|