Inspections for the day of: Thursday, April 8, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00669 INSP-Sprinkler Rough-in/Hydro4/7/20044/8/20044/8/2004 12:00:00 AMAFAIL
The onsite sprinkler fitter did not have the approved plans on site for me to perform the inspection 4/8/2004 8:33:19 AM
BLD04-00434 FIRE-Final Inspection4/7/20044/8/20044/8/2004 12:00:00 AMAFAIL
Floor plans as approved do not match what is existing. Resubmit plans for approval. Provide fire extinguishers. Provide emergency light in corridor. This was not a complete inspection. 4/8/2004 10:29:23 AM
FIR04-00044 INSP-Final Inspection4/7/20044/8/20044/8/2004 12:00:00 AMAFAIL
Inspection was for 60 second trip test on the dry pipe system. Water made it there right on 60 seconds. Ceilings still being installed 4/8/2004 8:39:06 AM
FIR04-00024 INSP-Sprinkler Rough-in4/7/20044/8/20044/8/2004 12:00:00 AMPPART
second floor sprinkler piping rough-in is ok .Other areas I looked at do not match plans. I spoke to Bill Alexander and he agreed with me that resubmittals are needed prior to a rough-in inspection. I left a message on Tom's phone and spoke to the on site sprinkler fitter about it. 4/8/2004 3:26:04 PM
BLD03-01695 FIRE-Final Inspection4/8/20044/8/20044/8/2004 12:00:00 AMPFAIL
Need to address issues for the fire alarm and the fire sprinkler inspections which include alarm signals being incorrect and no updated fire sprinkler drawings on site for their inspection. Other issues include exit signs and emergency lights not working, white lettering on the fire dept. access lanes, signage on riser room, hydraulic placards for riser, NFPA 25, forward flush of the backflow preventer. 4/8/2004 4:24:43 PM
FIR03-00669 INSP-Sprinkler Rough-in/Hydro4/8/20044/8/20044/8/2004 12:00:00 AMPFAIL
See city approved plans for locations of missing hangers and earthquake bracing. Some piping could not be verified due to hard lids already being installed. I spoke to the general contractor about access to these areas. Not all areas have been inspected due to time restraints. Another inspection has been set up for tomorrow morning. 4/8/2004 3:35:02 PM
FIR04-00079 INSP-Sprinkler Rough-in4/8/20044/8/20044/8/2004 12:00:00 AMPPART
sprinkler piping is ok to cover on the first floor but earth quake bracing still needs to be done. See plans for locations where upright heads are over spaced 4/8/2004 12:17:50 PM
BLD04-00054 FIRE-Final Inspection4/8/20044/8/20044/8/2004 12:00:00 AMPPASS
Fire life safety finaled
BLD04-00054 FIRE-Final Inspection4/8/20044/8/20044/8/2004 12:00:00 AMPPASS
Fire life safety finaled
FIR04-00022 INSP-Final Inspection4/7/20044/8/20044/8/2004 12:00:00 AMPFAIL
All devices tested ok back to the panel but the monitoring station received nearly 100 alarm signals and had the address for the job site in virginia. new signals need to be sent. 4/8/2004 4:04:36 PM
FIR04-00123 INSP-Sprinkler Rough-in/Hydro4/6/20044/8/20044/8/2004 12:00:00 AMPPART
Underground hydro test is ok and the sprinkler rough-in is ok. Above ground hydro test failed. It appears the gauge fitting might be leaking 4/8/2004 3:28:43 PM
FIR04-00141 INSP-Sprinkler Rough-in4/7/20044/8/20044/8/2004 12:00:00 AMPPART
Contact Charles; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley
1st floor partial. OK to cover 2 rooms 1st floor (gypboard). Walked first floor, but too early for roughin.