Inspections for the day of: Friday, April 8, 2005.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM05-01006 Water and/or Sewer4/8/20054/8/20054/8/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 7:22:13 AM. Contact: ###-####. sw final ok 4/8/2005 8:56:53 AM
PLM05-01007 Water and/or Sewer4/8/20054/8/20054/8/2005 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 7:23:06 AM. Contact: ###-####. sw final ok 4/8/2005 8:56:42 AM
PLM05-01008 Water and/or Sewer4/8/20054/8/20054/8/2005 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 4/8/2005 at 7:24:00 AM. Contact: ###-####. move water line onto the building lot it serves. 4/8/2005 8:56:31 AM
PLM05-01052 Sprinkler (Final)4/7/20054/8/20054/8/2005 12:00:00 AMAPASS
###-#### - rod sp final ok 4/7/2005 2:02:45 PM
PLM05-01055 Final4/7/20054/8/20054/8/2005 12:00:00 AMAPASS
###-#### water service final ok existing sprinkler system abandoned 4/7/2005 1:53:03 PM
PLM04-03699 Final4/7/20054/8/20054/8/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 4/7/2005 at 2:59:21 PM. Contact: ###-####. temp occ ok needs avb on three other hair wash sinks. 4/8/2005 1:22:19 PM
PLM05-01026 Groundwork4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Per Joe, By Lisa; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel gw ok 4/8/2005 2:51:45 PM
PLM05-01026 Water and/or Sewer4/8/20054/8/20054/8/2005 12:00:00 AMPPART
Per Joe, By Lisa; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel sw ok with drivers on clamps at tie in rolled 180 deg. apart. 4/8/2005 2:56:28 PM
PLM05-00909 Final4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
###-####--kinley final ok 4/8/2005 9:21:53 AM
PLM05-00787 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:11:33 AM. Contact: ###-####. sp final ok 4/8/2005 3:12:42 PM
PLM05-00786 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:14:02 AM. sp final ok 4/8/2005 3:12:30 PM
PLM05-00788 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:14:55 AM. sp final ok 4/8/2005 3:09:53 PM
PLM05-00783 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:15:46 AM. sp final ok 4/8/2005 3:09:37 PM
PLM05-00784 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:16:33 AM. sp final ok 4/8/2005 3:06:54 PM
PLM05-00785 Sprinkler (Final)4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2005 at 9:17:21 AM. sp final ok 4/8/2005 3:01:26 PM
PLM05-01067 Water and/or Sewer4/8/20054/8/20054/8/2005 12:00:00 AMPPASS
###-#### - keith sw final ok 4/8/2005 2:40:03 PM
PLM05-01069 Plumbing Rough-in4/8/20054/8/20054/8/2005 12:00:00 AMPPART
in floor ri ok 4/8/2005 2:40:18 PM