FIR08-00147
| INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 4:33:57 PM | P | FAIL |
|
|
The a/v's have been lowered and function correctly. The pull stations function correctly however they respond as a zone 6 instead of a zone 1 as shown on the approved drawings. For a final the contractor needs to provide a map at the facp, as-builts with the zone change shown and testing of the duct smoke detectors as previously discussed. This includes a manometer test. The signals do go off site as verified by the fire dept responding to the testing.
|
FIR08-00161
| INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 4:27:05 PM | P | PART |
|
|
Three pendant heads located along the north wall exceed the 196 sq. ft. per head as specified on the permit application and the review comments. They have not been installed as per the plans which show them at 14' apart. They are installed at 16' apart. Provide verification that the heads can remain or relocate the heads to match the approved plans. Piping can be covered anyway. I will verify additional hangers if required at the final.
|
FIR07-00968
| INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 3:57:27 PM | P | PASS |
|
|
permit finaled
|
FIR07-00824
| INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 3:54:47 PM | P | PASS |
|
|
permit finaled
|
BLD07-03197
| FIRE-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 3:13:32 PM | P | FAIL |
|
|
The storage is limited to a maximum of 20'-0". The storage is currently at 21'-11 1/2". The storage needs to be reduced to 20'-0" or a resubmittal is required to go higher. Provide signage to limit the storage height to what ever is decided the maximum storage height will be.
|
FIR08-00223
| INSP-Sprinkler Rough-in | 4/7/2008 | 4/8/2008 | 4/8/2008 1:27:06 PM | A | PASS |
|
|
Office areas are ok to cover.
|
BLD08-00479
| FIRE-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 12:08:19 PM | P | PASS |
|
|
Life safety passed. Owner stated he would install a sign that stated maximum storage height of 16'-0". I went over the storage limitations as stated on the approved plans with him.
|
FIR08-00174
| INSP-Sprinkler Rough-in | 4/7/2008 | 4/8/2008 | 4/8/2008 10:52:12 AM | A | PASS |
|
|
The remaining sprinkler piping is ok to cover.
|
FIR07-00759
| INSP-Final Inspection | 4/7/2008 | 4/8/2008 | 4/8/2008 10:51:42 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00189
| INSP-Final Inspection | 4/7/2008 | 4/8/2008 | 4/8/2008 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 6:23:59 AM. Contact: ###-####.
|