Inspections for the day of: Wednesday, April 8, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00739 Site Final4/8/20094/8/20094/9/2009 8:51:47 AMPPASS
darren Phone #: ###-####
ESC06-01338 Aging Inspection4/8/20094/8/20094/9/2009 6:08:13 AM DONE
ESC08-00491 Tracking Control4/6/20094/8/20094/9/2009 6:05:22 AMPPART
still activily cleanig streets.
ESC09-00035 General Inspection4/8/20094/8/20094/8/2009 9:51:46 PMPDONE
Went over with sewer contractor over the cut through on Wallings Creek. Since creek is inactive, no water deversion will be needed. Advised the company to follow the 404 permit to stay compliant. Also instructed that NO DEWATERING activities can be discharged into Wallings Creek.
ESC07-00986 Tracking Control4/7/20094/8/20094/8/2009 4:43:29 PMAPASS
ESC08-00784 BMP Violation4/8/20094/8/20094/8/2009 3:42:09 PMPFAIL
Verbal to landscaper:
Move and clean up all sediment of of the hard surface where top soil was stock piled or install a sediment barrier at the end of the driveway. Will re-inspect 4/9/09.
ESC09-00084 Site Preparation4/8/20094/8/20094/8/2009 3:05:31 PM PASS
ESC09-00079 Site Preparation4/8/20094/8/20094/8/2009 3:05:17 PM PASS
ESC08-00706 BMP Violation4/7/20094/8/20094/8/2009 2:23:38 PMPPART
Due to the Canal company not wanting the canal stabilized the GC will not be stabilizing the canal. We recommended to stabilize prior to the canal being active, due to the disturbing of the canal with the construction developement of the site.
ESC09-00033 BMP Violation4/8/20094/8/20094/8/2009 2:21:24 PMPPASS
All violation were completed.
ESC09-00033 BMP Violation4/7/20094/8/20094/8/2009 10:41:51 AMAFAIL
Correction Notice: (Message left with RP)
1. Clean up all concrete residuel out of gutterpan.
2. Maintain storm drain inlet protection.
Complete by 2pm or PRIOR TO ANY STORM EVENT.
Failure to comply will result in a stop work order. Will re-inspect on 4/08/09 2:30pm
ESC09-00102 Site Preparation4/6/20094/8/20094/8/2009 9:03:30 AMACANC
Moved til 4/09/09AM
ESC09-00102 Conference4/7/20094/8/20094/8/2009 9:02:54 AMADONE
Went o ver the placement of entrance and washout pitfor the project area. Will re-inspect tomorrow in the AM for the site prep.