PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, April 8, 2009
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00739
Site Final
4/8/2009
4/8/2009
4/9/2009 8:51:47 AM
P
PASS
darren Phone #: ###-####
ESC06-01338
Aging Inspection
4/8/2009
4/8/2009
4/9/2009 6:08:13 AM
DONE
ESC08-00491
Tracking Control
4/6/2009
4/8/2009
4/9/2009 6:05:22 AM
P
PART
still activily cleanig streets.
ESC09-00035
General Inspection
4/8/2009
4/8/2009
4/8/2009 9:51:46 PM
P
DONE
Went over with sewer contractor over the cut through on Wallings Creek. Since creek is inactive, no water deversion will be needed. Advised the company to follow the 404 permit to stay compliant. Also instructed that NO DEWATERING activities can be discharged into Wallings Creek.
ESC07-00986
Tracking Control
4/7/2009
4/8/2009
4/8/2009 4:43:29 PM
A
PASS
ESC08-00784
BMP Violation
4/8/2009
4/8/2009
4/8/2009 3:42:09 PM
P
FAIL
Verbal to landscaper:
Move and clean up all sediment of of the hard surface where top soil was stock piled or install a sediment barrier at the end of the driveway. Will re-inspect 4/9/09.
ESC09-00084
Site Preparation
4/8/2009
4/8/2009
4/8/2009 3:05:31 PM
PASS
ESC09-00079
Site Preparation
4/8/2009
4/8/2009
4/8/2009 3:05:17 PM
PASS
ESC08-00706
BMP Violation
4/7/2009
4/8/2009
4/8/2009 2:23:38 PM
P
PART
Due to the Canal company not wanting the canal stabilized the GC will not be stabilizing the canal. We recommended to stabilize prior to the canal being active, due to the disturbing of the canal with the construction developement of the site.
ESC09-00033
BMP Violation
4/8/2009
4/8/2009
4/8/2009 2:21:24 PM
P
PASS
All violation were completed.
ESC09-00033
BMP Violation
4/7/2009
4/8/2009
4/8/2009 10:41:51 AM
A
FAIL
Correction Notice: (Message left with RP)
1. Clean up all concrete residuel out of gutterpan.
2. Maintain storm drain inlet protection.
Complete by 2pm or PRIOR TO ANY STORM EVENT.
Failure to comply will result in a stop work order. Will re-inspect on 4/08/09 2:30pm
ESC09-00102
Site Preparation
4/6/2009
4/8/2009
4/8/2009 9:03:30 AM
A
CANC
Moved til 4/09/09AM
ESC09-00102
Conference
4/7/2009
4/8/2009
4/8/2009 9:02:54 AM
A
DONE
Went o ver the placement of entrance and washout pitfor the project area. Will re-inspect tomorrow in the AM for the site prep.