ELE08-00658
| ELE-Aging Inspection | 4/8/2010 | 4/8/2010 | 4/16/2010 3:46:52 PM | | CANC |
|
|
wrong permit responded to
|
ELE10-00691
| Final | 4/8/2010 | 4/8/2010 | 4/8/2010 4:13:35 PM | P | PASS |
|
|
Eric ###-#### ok to final, no esc this project
|
ELE10-00725
| Final | 4/8/2010 | 4/8/2010 | 4/8/2010 4:12:55 PM | P | PASS |
|
|
Phil 371=9591 ok to final, no esc this project
|
ELE10-00722
| Electrical Rough-In | 4/7/2010 | 4/8/2010 | 4/8/2010 3:50:50 PM | P | PASS |
|
|
Inspection requested from web by: PAT MILLER Phone #: ###-#### ok to cover u/g, no esc this project
|
ELE10-00726
| Electrical Rough-In | 4/8/2010 | 4/8/2010 | 4/8/2010 3:27:10 PM | P | CANC |
|
|
wall inspection in 4 areas of office. call half hour to 45 min and I can meet you there Thanks Ron Inspection requested from web by: Ron Zimmerman Phone #: ###-#### called, told electrician to check and group any associated permits, and recall for am inspection
|
ELE10-00285
| Permanent Service | 4/6/2010 | 4/8/2010 | 4/8/2010 2:56:24 PM | P | PASS |
|
|
Contact: Brian Gee Inspection requested from web by: Deb Gooden Phone #: ###-#### p/s u/g n ok
|
ELE10-00285
| Final | 4/8/2010 | 4/8/2010 | 4/8/2010 2:56:16 PM | P | PASS |
|
|
Contact: Brian Gee Inspection requested from web by: Deb Gooden Phone #: ###-#### ok to final, no esc this project
|
ELE10-00628
| Electrical Rough-In | 4/8/2010 | 4/8/2010 | 4/8/2010 2:04:16 PM | P | PASS |
|
|
please call me half an hour before inspection to insure access thanks Shaun ###-#### Inspection requested from web by: Shaun Kirkman Phone #: ###-#### ok to cover floor heat, no esc this project
|
ELE10-00725
| Permanent Service | 4/7/2010 | 4/8/2010 | 4/8/2010 1:11:27 PM | P | PASS |
|
|
Inspection requested from web by: Phil Baker Phone #: ###-#### p/s o/h rec ok, no esc this project
|
ELE10-00691
| Electrical Rough-In | 4/8/2010 | 4/8/2010 | 4/8/2010 12:54:32 PM | P | PASS |
|
|
Call Eric 1/2 hour to going Phone #: ###-#### ric ok, no esc this project
|
ELE10-00423
| Electrical Rough-In | 4/7/2010 | 4/8/2010 | 4/8/2010 10:38:03 AM | A | CANC |
|
|
Please contact Rod (Wireman) at ###-#### on site. We would like to have an Underground Inspection of the new Conduit and Wire from the CT Can to the existing Idaho Power Transformer. Thank you. Inspection requested from web by: Clint Tate Phone #: ###-#### called, said that city doesn't inspect utility part of service, would add this note.no esc this project
|
ELE10-00153
| Electrical Rough-In | 4/8/2010 | 4/8/2010 | 4/8/2010 10:35:23 AM | P | PART |
|
|
Buz Phone #: ###-#### upper floors only ok to cover, basement later, no esc this project
|
ELE10-00094
| Final | 4/8/2010 | 4/8/2010 | 4/8/2010 10:24:42 AM | A | PASS |
|
|
Inspection requested from web by: clyde smart Phone #: ###-#### ok to final
|
ELE10-00227
| Final | 4/7/2010 | 4/8/2010 | 4/8/2010 9:40:22 AM | A | PASS |
|
|
MIKE PLEASE CALL FOR CODE Phone #: ###-#### ok to final, no esc this project
|
ELE10-00071
| Final | 4/5/2010 | 4/8/2010 | 4/8/2010 9:09:32 AM | A | PASS |
|
|
Bob, this is for cleanroom tool installs in 24A & 24B. Inspection requested from web by: Eric Landberg Phone #: ###-#### ok to final, no esc this project
|
ELE10-00070
| Final | 4/5/2010 | 4/8/2010 | 4/8/2010 9:05:04 AM | A | PASS |
|
|
Bob, this is for clean room tool installs in building 24C, 24D & 24E. Inspection requested from web by: Eric Landberg Phone #: ###-#### ok to final, no esc this project
|
ELE10-00069
| Final | 4/5/2010 | 4/8/2010 | 4/8/2010 9:04:21 AM | A | PASS |
|
|
This is my blanket permit for building 24. Inspection requested from web by: Eric Landberg Phone #: ###-#### ok to final, no esc this project
|
ELE10-00019
| Final | 4/7/2010 | 4/8/2010 | 4/8/2010 9:01:16 AM | A | PASS |
|
|
Bob, give me a call on my cell. ###-#### thanks Inspection requested from web by: Ken Heller Phone #: ###-#### ok to final, no esc this project
|
ELE09-01826
| Final | 4/7/2010 | 4/8/2010 | 4/8/2010 8:45:30 AM | A | FAIL |
|
|
Inspection requested from web by: Scott Campbell Phone #: ###-#### called, left correction notice, NEC 230.2)E), 225.37 shall identify services, 406.8 shall install listed wr type receptacles and in-use covers for outdoor receptacles, 210.8(B)(5) receptacles within 6' of sink shall be gfci protected, 406.4 receptacles shall be securely mounted, 406.4(D) receptacle face shall be flush with or project from faceplate NOTE: corrections shall be made within 5 working days or further action will be taken such as removal of power
|