Inspections for the day of: Thursday, April 8, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00674 FIRE-Final Inspection4/8/20104/8/20104/8/2010 3:49:57 PMPFAIL
The project is not ready for final inspection but the correct functioning of the smoke evacuation system was verified today with Lightning Electric.
FIR10-00143 INSP-Final Inspection4/8/20104/8/20104/8/2010 3:31:20 PMPPASS
Permit finaled.
FIR10-00071 INSP-Sprinkler Rough-in/Hydro4/8/20104/8/20104/8/2010 2:29:01 PMPPASS
The remaining sprinkler piping can be covered.
BLD10-00221 FIRE-Final Inspection4/8/20104/8/20104/8/2010 1:48:54 PMPPASS
Life safety passed
FIR10-00139 INSP-Final Inspection4/7/20104/8/20104/8/2010 1:48:04 PMPPASS
Permit finaled
FIR10-00018 INSP-Sprinkler Rough-in/Hydro4/7/20104/8/20104/8/2010 11:32:50 AMAFAIL
Overhead hydro test failed due to pressure drop and visable leak.
BLD09-02299 FIRE-Final Inspection4/8/20104/8/20104/8/2010 10:33:04 AMPPASS
Life safety passed.
BLD09-02069 FIRE-Final Inspection4/7/20104/8/20104/8/2010 10:05:52 AMAPART
The phase 1 fire life safety is passed.
FIR10-00032 INSP-Final Inspection4/8/20104/8/20104/8/2010 10:05:30 AMPPART
The phase 1 fire sprinkler work is passed.
FIR10-00073 INSP-Final Inspection4/8/20104/8/20104/8/2010 10:05:00 AMPPART
The phase 1 fire alarm testing is passed.
BLD09-02299 FIRE-Final Inspection4/7/20104/8/20104/8/2010 9:10:07 AMAFAIL
The north east exit discharge light did not operate. All other items passed.
FIR09-00728 INSP-Conference4/6/20104/8/20104/6/2010 1:40:07 PMPCANC
Bret Anderson- our office is in Nampa so please give us time to arrive on time to meet you. We will also be calling the contractor to be included in the meeting. Inspection requested from web by: Diane Turner Phone #: ###-#### Inspection cancelled from web by: Diane Turner