ESC10-00887
| General Inspection | 4/5/2011 | 4/5/2011 | | | |
|
|
|
BLD11-00563
| BLD-Final | 4/8/2011 | 4/8/2011 | 4/11/2011 9:51:07 AM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Sandra Judge
|
BLD11-00504
| BLD-Foundation | 4/7/2011 | 4/8/2011 | 4/11/2011 9:50:29 AM | P | PASS |
|
|
Ryan- Phone #: ###-####
|
BLD09-01711
| BLD-Final | 4/7/2011 | 4/8/2011 | 4/11/2011 9:50:02 AM | P | NR |
|
|
bryce Phone #: ###-####
|
BLD11-00510
| BLD-Foundation | 4/7/2011 | 4/8/2011 | 4/8/2011 4:48:06 PM | A | PASS |
|
|
|
ESC11-00135
| Site Preparation | 4/7/2011 | 4/8/2011 | 4/8/2011 1:04:58 PM | A | PASS |
|
|
James phone ....Talked to James..Sign posted Pumping concrete...they wont have any washout....Need straw waddle or remove soil and trench out at sidewalk. Will be backfilling soon and no rain event in near future. hgj cdhe
|
MIS11-00079
| BLD-Final | 4/5/2011 | 4/8/2011 | 4/6/2011 11:24:38 AM | A | CANC |
|
|
All repairs were to be completed by Thursday evening. Please contact Debbie for access.
Thank you, Phone #: ###-#### >> Inspection requested via web by Connie LaFrainer Inspection cancelled from web by: Connie LaFrainer
|