Inspections for the day of: Friday, April 8, 2011.
Number of inspections: 12
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-02614 BLD-Conference4/4/20114/4/2011 A 
BLD10-02107 BLD-Conference4/4/20114/4/2011 A 
BLD06-01960 BLD-Aging Inspection4/8/20114/8/20114/14/2011 8:38:41 AM PASS
BLD11-00037 BLD-Wall cover4/7/20114/8/20114/11/2011 10:27:30 AMPPASS
ryan Phone #: ###-#### ok to cover the rest of first floor and all of the basement
ESC11-00121 General Inspection4/8/20114/8/20114/8/2011 2:12:21 PMAPASS
BLD11-00453 BLD-Foundation4/7/20114/8/20114/8/2011 2:11:00 PMAPASS
early as possible//Kenji Phone #: ###-####
ESC10-00364 General Inspection4/8/20114/8/20114/8/2011 2:07:30 PM PASS
BLD11-00447 BLD-Conference4/7/20114/8/20114/8/2011 10:26:48 AMADONE
Conference as requested by Sam Zahorka and Dave Hannah to cover redlines, etc. Dave, I told him you would be out in the morning, please call John Berryhill on his cell phone with a more specific time, so he will sure and be there. John-###-####. Thanks, Angie
BLD07-01605 DOC - Permit Finaled4/8/20114/8/20114/8/2011 10:25:40 AMPPASS
ESC11-00062 General Inspection4/8/20114/8/20114/8/2011 9:37:59 AMAPART
told crew to get a washout on site
BLD11-00216 BLD-Footing4/7/20114/8/20114/8/2011 9:36:35 AMAPASS
Scott Phone #: ###-####
BLD11-00300 BLD-Framing/Rough-in4/7/20114/8/20114/8/2011 9:33:00 AMANR
john Phone #: ###-#### needs plumbing and elec rough ins and fire blocking in furred out wall got mti s report on bolting all passed also ok fix on cut floor joist in basement