Inspections for the day of: Friday, April 8, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00676 Tracking Control4/7/20114/8/20114/11/2011 1:25:34 PMAPASS
ESC11-00049 Site Preparation4/6/20114/8/20114/11/2011 7:26:15 AMACANC
ESC10-00850 Site Preparation4/8/20114/8/20114/8/2011 2:17:53 PMPPASS
Verbal to RP:
MAintain the stabilized construction exit. Also if dewatering needs to occur to notify the city prior to activity starting to occur.
ESC11-00028 Tracking Control4/6/20114/8/20114/8/2011 11:12:24 AMAPASS
ESC10-00535 General Inspection4/8/20114/8/20114/8/2011 10:42:49 AM PASS
ESC10-00898 General Inspection4/8/20114/8/20114/8/2011 10:39:20 AM CANC
ESC10-00743 General Inspection4/8/20114/8/20114/8/2011 10:10:46 AM PASS
ESC11-00048 General Inspection4/8/20114/8/20114/8/2011 9:56:23 AM FAIL
Verbal to RP:
Imeadiately provide a concrete washout pit prior to the concrete trucks needing to clean out.
ESC11-00117 General Inspection4/8/20114/8/20114/8/2011 9:52:47 AM PASS
They have added additional sediment barriers along the drainage swale.
ESC11-00102 Tracking Control4/8/20114/8/20114/8/2011 9:27:33 AMPFAIL
Verbal to RP:
Clean up all hard surfaces of all sediment and debris and stock pile of material. Follow up with a sweep over all surfaces that impact the storm drains. Will follow up on 4/11/2011am.