FIR12-00493
| INSP-Final Inspection | 4/8/2013 | 4/8/2013 | 4/8/2013 3:44:15 PM | P | FAIL |
|
|
Unable to finish inspection due to the fire sprinkler contractor not being ready. All items tested ok except testing for the fire sprinkler devices. Rick is going to provide as-builts showing the additional duct smoke detector.
|
FIR13-00144
| INSP-Sprinkler Rough-in | 4/8/2013 | 4/8/2013 | 4/8/2013 3:40:57 PM | P | PASS |
|
|
Sprinkler piping can be covered. Three pendant heads are overspace and will be checked at the final inspection for proper spacing. Insulation at the roof deck needs to be repaired in two locations.
|