Inspections for the day of: Monday, April 8, 2013.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00493 INSP-Final Inspection4/8/20134/8/20134/8/2013 3:44:15 PMPFAIL
Unable to finish inspection due to the fire sprinkler contractor not being ready. All items tested ok except testing for the fire sprinkler devices. Rick is going to provide as-builts showing the additional duct smoke detector.
FIR13-00144 INSP-Sprinkler Rough-in4/8/20134/8/20134/8/2013 3:40:57 PMPPASS
Sprinkler piping can be covered. Three pendant heads are overspace and will be checked at the final inspection for proper spacing. Insulation at the roof deck needs to be repaired in two locations.