PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, April 8, 2013
.
Number of inspections:
16
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC13-00276
General Inspection
4/7/2013
4/8/2013
4/9/2013 9:09:24 AM
A
PASS
ESC13-00288
BMP Violation
4/5/2013
4/8/2013
4/9/2013 8:15:45 AM
A
FAIL
C/N given to RP:
Re-install silt fence in the north section per industry standards.
Post ESC sign where visable from the street.
Maintain construction access on the east side of the project.
**Failure to comply with the given notice, will result in further enforcement. Will re-inspect on 04/11/13.
ESC13-00311
Site Preparation
4/8/2013
4/8/2013
4/9/2013 8:15:31 AM
NR
ESC11-00878
General Inspection
4/8/2013
4/8/2013
4/8/2013 2:33:16 PM
FAIL
Verbal to RP:
Clean up mortar overflow and residual off of the lot and place it into a contained area. Maintain the bmp's located at the back of lot.
ESC13-00316
Site Preparation
4/8/2013
4/8/2013
4/8/2013 2:08:45 PM
NR
ESC11-00765
Aging Inspection
4/8/2013
4/8/2013
4/8/2013 2:08:33 PM
DONE
No activity
ESC12-00860
General Inspection
4/8/2013
4/8/2013
4/8/2013 1:59:48 PM
DONE
Permit finaled
ESC12-00860
DOC - Permit Finaled
4/8/2013
4/8/2013
4/8/2013 1:59:37 PM
P
PASS
ESC12-00256
Aging Inspection
4/8/2013
4/8/2013
4/8/2013 1:59:14 PM
PASS
ESC13-00250
Conference
4/8/2013
4/8/2013
4/8/2013 1:58:21 PM
A
DONE
Work will not begin on the project except for BMP installation due to the NOI being submitted today. Operator will be waiting 14 calender days. Discussed over sediment controls and where the location of the fueling area will be relocated then where the map indicated.
ESC13-00250
Site Preparation
4/8/2013
4/8/2013
4/8/2013 1:55:20 PM
CANC
Moved to a confrence
ESC09-00352
General Inspection
4/8/2013
4/8/2013
4/8/2013 1:54:44 PM
FAIL
Message to RP: C/N written
Clean up the above ground washout where concrete residual is overflowing on the disturbed soil and not contained. Will follow up on 4/10/2013
ESC12-00758
General Inspection
4/8/2013
4/8/2013
4/8/2013 9:24:30 AM
PASS
ESC11-00808
Aging Inspection
4/8/2013
4/8/2013
4/8/2013 9:06:41 AM
PASS
ESC12-00560
General Inspection
4/8/2013
4/8/2013
4/8/2013 9:05:39 AM
NR
ESC12-00467
General Inspection
4/8/2013
4/8/2013
4/8/2013 8:59:51 AM
PASS