ESC14-00086
| Site Preparation | 4/8/2014 | 4/8/2014 | 4/8/2014 5:50:57 PM | A | CANC |
|
|
scheduled for 9 AM Wednesday April 9
|
ESC13-00193
| BMP Violation | 4/8/2014 | 4/8/2014 | 4/8/2014 5:13:08 PM | P | PASS |
|
|
SWO has been removed. Re-inspection found the site to be in compliance with permit conditions and approved ESC plan.
Perimeter BMPs have been re-installed completely since initial correction notice
An exception for the construction access is allowed due to the fact road mix shall be laid down in an early phase of the project. Contractor Terry Wright will increase sweeping during this phase to address any trackout issues onto Crestline.
Approved for construction/excavation. All parcel holds have been removed.
|
ESC13-00288
| General Inspection | 4/7/2014 | 4/8/2014 | 4/8/2014 11:43:35 AM | A | PASS |
|
|
Rescheduled from Monday 4/7
|
ESC13-00628
| Aging Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 11:27:34 AM | | PART |
|
|
No major violations but need to clean up dirt and dried stucco pile on adjacent lot. Verbal request to RP. Will continue to monitor while inspecting Harris Ranch.
|
ESC13-01109
| Site Preparation | 4/7/2014 | 4/8/2014 | 4/8/2014 11:25:26 AM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Permit posted. K&H homes/Hunter have been cooperative with requests and maintaining BMPs. Approved.
|
ESC14-00125
| Site Preparation | 4/8/2014 | 4/8/2014 | 4/8/2014 11:11:57 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Need to sweep sidewalk on Playwright and clean up wood debris at multiple sites. Debris and materials also need to be cleared on River Basin.
|
ESC13-01148
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 10:22:23 AM | | PASS |
|
|
Project has resumed. Berm located at bottom of project contains sediment. No trackout or materials in street. Approved.
|
ESC13-01167
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 10:00:37 AM | | PASS |
|
|
Using adjacent lot for stockpiling and has seperate permit. Permits posted. No trackout or other violations. Approved.
|
ESC13-01173
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 9:47:02 AM | | PASS |
|
|
BMPs installed. Quality washout construction/placement. Permit posted. No violations observed.
|
ESC13-01151
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 9:46:09 AM | | PASS |
|
|
Permit posted. Liquid waste washout provided. No sediment/disturbance beyond back retaining wall. Approved.
|
ESC13-01149
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 9:38:10 AM | | PASS |
|
|
Finaled.
|
ESC13-01149
| DOC - Permit Finaled | 4/8/2014 | 4/8/2014 | 4/8/2014 9:38:09 AM | P | PASS |
|
|
Project complete. Temporary BMPs removed. ESC permit conditions satisfied.
|
ESC12-00398
| General Inspection | 4/8/2014 | 4/8/2014 | 4/8/2014 9:21:54 AM | | PASS |
|
|
Finaled.
|
ESC12-00398
| DOC - Permit Finaled | 4/8/2014 | 4/8/2014 | 4/8/2014 9:21:37 AM | P | PASS |
|
|
8th & Main Tower is complete and exterior has been stabilized/cleaned. Offsite staging area has been cleaned with no remaining acitivity.
|