Inspections for the day of: Wednesday, April 8, 2015.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00962 General Inspection4/8/20154/8/20154/8/2015 4:42:59 PM CANC
rescheduled
ESC13-00193 General Inspection4/8/20154/8/20154/8/2015 4:42:31 PM CANC
rescheduled
ESC14-00759 General Inspection4/8/20154/8/20154/8/2015 4:06:15 PM CANC
rescheduled
ESC14-00971 Site Final4/8/20154/8/20154/8/2015 2:31:11 PMPPEND
Builder to inform me whether the HOA manager for Abode Subdivion would like to keep inlet filters and maintain them themselves. I Will final once responsibility of inlet bags is confirmed. No issues at site.
ESC14-00965 Site Final4/8/20154/8/20154/8/2015 2:29:16 PMPPASS
Check to see if inlet bag is still installed...

All temporary BMPs have been removed and site has been cleaned and stabilized. ESC permit conditions satisfied & permit finaled.
ESC14-00965 DOC - Permit Finaled4/8/20154/8/20154/8/2015 2:28:31 PMPPASS
ESC14-00667 Aging Inspection4/8/20154/8/20154/8/2015 2:07:33 PM PASS
Construction complete. ESC permit conditions satisfied. Permit finaled.
ESC14-00667 DOC - Permit Finaled4/8/20154/8/20154/8/2015 2:06:50 PMPPASS
ESC14-00666 Aging Inspection4/8/20154/8/20154/8/2015 2:05:16 PM PASS
Construction complete. Yard is landscaped and stabilized. Construction materials and loose sediment have been cleaned up. Permit finaled.
ESC14-00666 DOC - Permit Finaled4/8/20154/8/20154/8/2015 2:04:28 PMPPASS
ESC14-00967 General Inspection4/8/20154/8/20154/8/2015 12:35:24 PM PASS
Cell tower complete. Located with gravel construction yard. ESC permit conditions satisfied.
ESC14-00967 DOC - Permit Finaled4/8/20154/8/20154/8/2015 12:34:43 PMPPASS
ESC14-00806 Aging Inspection4/8/20154/8/20154/8/2015 12:16:00 PM PASS
Home complete and landscaped. Home is occupied. No corrections for this house, but need to remove inlet filter bags and sweep up some minor sediment accumulations in gutters/streets. See ESC14-00971

Approved.
ESC14-00806 DOC - Permit Finaled4/8/20154/8/20154/8/2015 12:14:45 PMPPASS
ESC14-00725 General Inspection4/8/20154/8/20154/8/2015 11:58:26 AM PASS
Sediment controls on site perimeter discharge points are installed and working effectively. Frame of home is complete. Stucco waste being contained in a pit to prevent runoff. Trash container provided and in use. No corrections at this time.
ESC15-00242 Site Preparation4/7/20154/8/20154/8/2015 11:52:10 AMANR
Phone #: ###-#### Inspection requested via web by Austin Wagner

Permit posted. DH #12 stormwater inlets have coir mat protection.

Corrections:

1. Provide lined washout pit (current pit does not have a lining, but is containing cement washout from streets/gutters)
2. Conduct meeting with sub-contractors to resist urge to drive on mud on adjacent lots. Trackout is beginning to accumulate. Parking should be on paved areas. Mud clods should be scraped at end of day work.

Approved to start but other new site preps will be failed without corrections.
ESC15-00243 Site Preparation4/7/20154/8/20154/8/2015 11:51:48 AMAPART
Phone #: ###-#### Inspection requested via web by Austin Wagner

Permit posted. DH #12 stormwater inlets have coir mat protection.

Corrections:

1. Provide lined washout pit (current pit does not have a lining, but is containing cement washout from streets/gutters)
2. Conduct meeting with sub-contractors to resist urge to drive on mud on adjacent lots. Trackout is beginning to accumulate. Parking should be on paved areas. Mud clods should be scraped at end of day work.

Approved to start but other new site preps will be failed without corrections.
ESC15-00224 Site Preparation4/7/20154/8/20154/8/2015 11:39:39 AMAPASS
Phone #: ###-#### Inspection requested via web by Austin Wagner

Permit posted. Site ready for foundation work. Approved.

Due to recent rain, requested that Hunter discuss controlling trackout with subcontractors as much as pacticable.
ESC14-00980 Aging Inspection4/8/20154/8/20154/8/2015 11:32:17 AM FAIL
Corrections:

1. No concrete washout used. Need to clean up concrete waste. Dave Evans construction sites will be monitored closely for non-compliant washouts.
2. Sweep sidewalks and gutter in culdesac.

Verbal correction left on RP Dave. Bashista's voicemail. Will check back.
ESC14-00157 General Inspection4/8/20154/8/20154/8/2015 11:20:47 AM PASS
Home construction complete. Yard has been landscaped/stabilized and gutters & sidewalks cleaned. BLD permit final pending interior changes. No further ESC inspections required, permit finaled.
ESC14-00157 DOC - Permit Finaled4/8/20154/8/20154/8/2015 11:19:08 AMPPASS
ESC15-00136 Site Preparation4/7/20154/8/20154/8/2015 11:00:07 AMAPASS
Please call 30min ahead to meet - Shawn Phone #: ###-####

RP-GC familiar with ESC permit conditions and BMPs. No MS4 infrastructure in area for stormwater. Work will occur within confines of vegetated back yard. Permit to be posted once work begins. Approved for construction.
ESC14-00944 General Inspection4/8/20154/8/20154/8/2015 10:43:44 AM PASS
No sediment leaving site. Trash contained. Keeping within limits of construction. Approved
ESC14-00823 General Inspection4/8/20154/8/20154/8/2015 10:41:05 AM CANC
rescheduled for thursday
ESC14-00751 Conference4/7/20154/8/20154/8/2015 10:32:53 AMAPASS
9 AM pre-construction meeting scheduled

Meeting to discuss project at City Hall and onsite walk through inspection were conducted.

BMPs will include inlet protection on the small drop inlet on southeast curbing. Once the stormdrains are replaced by drainage swale, the swale will require protection until project completion.

The final phase of project to build ramps on ACHD greenbelt path will occur in June. At this time, wattles will be installed along fence line to protect the flume adjacent to the path.

Approved for construction. Work to begin next Monday April 13.