BLD14-02173
| BLD-Energy code compliance | 4/7/2016 | 4/8/2016 | 4/12/2016 9:35:44 AM | A | PART |
|
|
John Phone #: ###-####
|
BLD15-04496
| BLD-Framing/Rough-in | 4/8/2016 | 4/8/2016 | 4/12/2016 9:34:17 AM | P | PASS |
|
|
Rod also has electrical and plumbing inspections scheduled for the PM. Phone #: ###-####
|
BLD16-00683
| BLD-Final | 4/7/2016 | 4/8/2016 | 4/12/2016 7:13:07 AM | A | PASS |
|
|
Zack Phone #: ###-####
|
GCB15-00090
| GCB-Fndatn/slab ins/fld vent | 4/7/2016 | 4/8/2016 | 4/9/2016 7:58:30 AM | A | PASS |
|
|
Chris ###-#### - Rebar Insp.
|
BLD15-02849
| BLD-Wall Bracing | 4/8/2016 | 4/8/2016 | 4/9/2016 7:57:56 AM | P | PASS |
|
|
Looking for interior sheer wall Sheetrock inspection. The plans are in the locked mail box onsite and the code is 1027 please give me a call with any questions. Thanks Drew Moorhouse ###-#### Phone #: ###-#### Inspection requested via web by Drew Moorhouse
|
BLD16-00855
| BLD-Footing | 4/8/2016 | 4/8/2016 | 4/9/2016 7:57:35 AM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD15-02043
| BLD-Foundation | 4/5/2016 | 4/8/2016 | 4/9/2016 7:57:15 AM | P | PEND |
|
|
Rebar // Chris Phone #: ###-####
|
BLD16-00649
| BLD-Wall Bracing | 4/7/2016 | 4/8/2016 | 4/9/2016 7:55:58 AM | A | PASS |
|
|
Zane Phone #: ###-####
|
BLD15-03390
| BLD-Conference | 4/8/2016 | 4/8/2016 | 4/9/2016 7:55:29 AM | P | DONE |
|
|
Kelly Phone #: ###-####
|
BLD14-03207
| BLD-Conference | 4/8/2016 | 4/8/2016 | 4/9/2016 7:55:09 AM | P | DONE |
|
|
Adam Phone #: ###-####
|
BLD16-00724
| BLD-Foundation | 4/7/2016 | 4/8/2016 | 4/8/2016 9:12:08 AM | A | DONE |
|
|
Zane Phone #: ###-####
|
BLD16-00545
| BLD-Framing/Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 9:09:29 AM | A | PART |
|
|
Tom Phone #: ###-#### c/n on site ok to insulate
|
BLD16-00544
| BLD-Energy code compliance | 4/7/2016 | 4/8/2016 | 4/8/2016 9:08:40 AM | A | PASS |
|
|
Tom Phone #: ###-####
|