FIR16-00145
| INSP-Supply line flush | 4/7/2016 | 4/8/2016 | 4/8/2016 1:42:39 PM | A | PASS |
|
|
Forward flow test of the backflow preventor passed
|
BLD14-02438
| FIRE-Final Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 10:42:29 AM | P | PASS |
|
|
Life safety passed
|
BLD16-00850
| FIRE-Final Inspection | 4/7/2016 | 4/8/2016 | 4/8/2016 10:35:21 AM | A | PASS |
|
|
life safety passed.
|
FIR15-00709
| INSP-Sprinkler Rough-in | 4/7/2016 | 4/8/2016 | 4/8/2016 10:13:54 AM | A | PASS |
|
|
3rd and 4th floor Rooms inspection passed. Piping above rooms and in stairwells can be covered. Corridor piping is not complete yet.
|
FIR15-00892
| INSP-Sprinkler Rough-in/Hydro | 4/7/2016 | 4/8/2016 | 4/8/2016 9:45:15 AM | A | PASS |
|
|
Overhead hydro test passed
|