ELE16-02784
| Final | 4/8/2019 | 4/8/2019 | 4/8/2019 6:47:44 PM | P | FAIL |
|
|
Scott Phone #: ###-#### 110.3- Installations shall be done as per manufacturers instructions. Level 2 bedroom has reverse polarity, all outdoor receptacle in use covers shall have proper covers. 110.26- Minimum work width shall be provided for 200 amp panel located in mechanical room. 210.8- GFCI protection shall be provided for all receptacles located with in 6' of a sink. Level 2 bed to right of vanity sink. 210.12- AFCI protection shall be provided for all outlets located in bedroom areas. level 3 no protection. 210.52(C)- Kitchen counter top areas shall have receptacles installed so that no point measured along wall line is more than 24" from a receptacle. 250.24(A)(5)- Grounding and grounded conductors shall be seperated on load side of service disconnect. Feeders to 200amp panel equipment ground terminated with grounded conductor. Verify others. 314.25- All boxes shall have covers. Misc through out. 406.12- All residential receptacles shall be tamper resistant type. 410.16- Luminaires located in clothes closets shall have totally enclosed lamps. 422.31- All hard wired appliances shall have a disconnecting means. 110.25- lockouts acceptacle. 424.45(E)- Verify or provide proof class A GFCI protection is provided by floor heat thermostats. Master floor heat not installed, cover box.
|
ELE19-01231
| Electrical Rough-In | 4/8/2019 | 4/8/2019 | 4/8/2019 3:46:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Wall rough in ok cover.
|
ELE19-01226
| Conference | 4/8/2019 | 4/8/2019 | 4/8/2019 3:24:32 PM | P | DONE |
|
|
Service mast Phone #: ###-#### Inspection requested via web by Garrett Collins Discussed overhead service entrance clearance from windows. New service mast will be located between windows and from attachment point should clear windows by well over the 3' needed. Will install 2 ground rods and will include metal underground water pipe in future if needed. New panels will be installed in each unit with new house panel, new codes only apply to new work being performed.
|
ELE18-02369
| Permanent Service | 4/8/2019 | 4/8/2019 | 4/8/2019 2:33:37 PM | P | PASS |
|
|
Joey ###-#### p/s u/g n ok
|
ELE19-00345
| Final | 4/8/2019 | 4/8/2019 | 4/8/2019 1:45:34 PM | P | PASS |
|
|
j-box cover installed at women''s 2nd floor. Randy is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Final ok
|
ELE18-02369
| Permanent Service | 4/1/2019 | 4/8/2019 | 4/8/2019 12:23:55 PM | A | NR |
|
|
Joey Phone #: ###-#### Field testing being performed at time of inspection as per 230.95(C). 110.24- Available fault current shall be posted prior to permanent service inspection
|
ELE18-02369
| Electrical Rough-In | 4/8/2019 | 4/8/2019 | 4/8/2019 12:20:56 PM | P | PASS |
|
|
Joey Phone #: ###-#### Bollard bases east end and pole bases north side rough in ok cover
|
ELE19-00236
| Final | 4/5/2019 | 4/8/2019 | 4/8/2019 10:14:55 AM | A | FAIL |
|
|
Garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk 210.52- A receptacle outlets shall be located with in 6' of each side of fire place. Receptacles located in cabinets do not count.
|
ELE19-00093
| Final | 4/5/2019 | 4/8/2019 | 4/8/2019 9:40:01 AM | A | FAIL |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn 300.15- At each outlet point NM cable shall terminate in a box. Above fireplace 14-2 left in wall shall terminate in a box. 314,17(B)- Where NM cable enters a box the jacket shall enter box 1/4" [ast clamp minimum in level 1 bathroom receptacle. 422.31- Hard wired range hood shall have a disconnecting means. Lock out is acceptable as per 110.25.
|
ELE19-00345
| Final | 4/8/2019 | 4/8/2019 | 4/8/2019 8:49:04 AM | A | FAIL |
|
|
Randy is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 314.25- All boxes shall have covers. Level 2 womens under counter 2 gang junction box open.
|