BLD01-00227
| BLD-Energy code compliance | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 12:18:02. Contact: ###-####. 4/9/2001 8:54:06 AM Frame OK. 4/9/2001 8:54:32 AM
|
BLD00-03601
| BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PASS |
|
|
Matt ###-#### C/C issued. 4/9/2001 11:05:18 AM
|
BLD00-03626
| BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PART |
|
|
Walt Deppel ###-#### OK to Occupy MFG Home, .....C/N Have 120 days to demo house and 30 days after that to construct garage. 4/9/2001 9:50:39 AM
|
BLD01-00745
| BLD-Footing | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
###-####
|
BLD01-00381
| BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | CANC |
|
|
ceiling grid janene 376-387\\canc by janene
|
BLD01-00396
| BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
shear panel Steve ###-#### Shear OK. 4/9/2001 6:52:37 PM
|
BLD01-00556
| BLD-Wall cover | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 10:03:11. Contact: ###-####. Should have been Found insp.....Found PASS. 4/9/2001 3:59:58 PM
|
MEC01-00599
| Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 10:44:06. Contact: ###-####.
|