PLM01-01023
| Water and/or Sewer | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PASS |
|
|
floyd ###-#### w/s final for mobile home hookup #58
|
PLM01-00433
| Groundwork | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 14:21:57. Contact: ###-####.
|
PLM01-01027
| Plumbing Rough-in | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PART |
|
|
###-#### move existing washer vent to 10' from new openable window upstairs, tie ins in crawlspace not complee, ok to cover 4/9/2001 9:52:52 AM
|
PLM01-01028
| Water and/or Sewer | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PART |
|
|
###-#### house to tank ok 4/9/2001 10:31:22 AM
|
PLM01-00433
| Groundwork | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 08:00:30. Contact: ###-####. comb w&v north wall 4/9/2001 3:30:37 PM
|
PLM01-01032
| Plumbing Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-01032
| Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | NR |
|
|
|
PLM00-00010
| Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | FAIL |
|
|
reinspection ###-#### not all corrections made 4/9/2001 4:10:58 PM
|
PLM01-00280
| Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 11:09:43. Contact: ###-####. rp drain ok needs to separate interceptor vents 4/9/2001 3:40:13 PM
|
PLM01-00508
| Water and/or Sewer | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 4/9/2001 2:01:31 PM sewer main test ok
|
PLM01-01028
| Water and/or Sewer | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 4/9/2001 4:00:44 PM added a dry line sewer
|