BLD00-01744
| BLD-Framing/Rough-in | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 14:36:41. Contact: ###-####. ok to rock penthouse 4/9/2001 1:20:58 PM
|
BLD01-00061
| BLD-Foundation | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 09:39:54. Contact: ###-####.
|
BLD00-03244
| BLD-Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | A | NR |
|
|
Added by Inspector: 407 On 4/9/2001 11:34:54 AM contractor called wanted me to come by ,said they would be ready its now 11:30 and are not ready.,front landing not in place. 4/9/2001 11:59:42 AM
|
BLD00-01181
| BLD-Conference | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 407 On 4/9/2001 3:21:12 PM
|
BLD00-03244
| BLD-Final | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 407 On 4/9/2001 5:08:31 PM ok certificate of compliance.
|
BLD01-00796
| BLD-Footing | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PART |
|
|
JIm ###-#### around 2:00 if possible
|
BLD00-01182
| BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | FAIL |
|
|
DWAYNE-- ###-#### FN OCC--ACCESS FOR GAR IS 1001ENTER ok except needs saftey glazzing at rear unit window with-in 5 foot of landing c/n. 4/9/2001 3:22:03 PM
|
BLD00-01181
| BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
###-#### DWAYNE --GAR CODE IS 1001ENTER
|
BLD01-00631
| BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 12:00:00 AM | P | PASS |
|
|
call 1st before insp randy-- ###-#### fr insp
|