Inspections for the day of: Tuesday, April 9, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00276 BLD-Framing/Rough-in4/8/20024/9/20024/9/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/08/2002 at 12:35:23. Contact: ###-####. ok to cover, c/n ok...install rails & doors as needed per plan 4/9/2002 1:25:32 PM
BLD98-03705 BLD-Foundation4/8/20024/9/20024/9/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/08/2002 at 15:11:09. Contact: . column/wall/ ftg...ok pend spec insp report. 4/9/2002 1:29:37 PM
BLD02-00633 BLD-Footing4/9/20024/9/20024/9/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/09/2002 at 06:48:34. Contact: ###-####. install steel, show p.lines. 4/9/2002 1:26:32 PM
BLD01-00606 BLD-Final4/9/20024/9/20024/9/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 04/09/2002 at 08:02:50. Contact: ###-####. nr, recall 4/9/2002 5:04:20 PM
BLD01-00597 BLD-Final4/9/20024/9/20024/9/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 04/09/2002 at 08:04:58. Contact: ###-####.
BLD01-01347 BLD-Framing/Rough-in4/9/20024/9/20024/9/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/09/2002 at 10:19:07. Contact: ###-####. walls ok at lounge area, patch roof/clg, verify s/f dampers 4/9/2002 5:24:10 PM
BLD02-00633 BLD-Footing4/9/20024/9/20024/9/2002 12:00:00 AMPPART
for strap- ###-#### ft -re-insp..set backs appear ok, strung 1 side; show wall steel at fnd insp 4/9/2002 2:58:26 PM
MIS02-00073 BLD-Conference4/9/20024/9/20024/9/2002 12:00:00 AMPPASS
w/ Rick J & arch onsite re exit doors
BLD02-00276 BLD-Conference4/9/20024/9/20024/9/2002 12:00:00 AMPPASS
w/ Fire & arch onsite re exit doors.
BLD01-03005 BLD-Conference4/8/20024/9/20024/9/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/08/2002 at 11:38:20. Contact: ###-####....met w/ bldr & mason; install front steps to be even...at upper set. 4/9/2002 2:37:49 PM