Inspections for the day of: Tuesday, April 9, 2002.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-02556 Final4/8/20024/9/20024/9/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/08/2002 at 06:27:01. Contact: ###-####. no access. left message with contact phone to reschedule inspection. left card. 4/9/2002 10:07:19 AM
ELE01-04273 Final4/8/20024/9/20024/9/2002 12:00:00 AMAPASS
###-#### jerry
ELE02-00634 Final4/8/20024/9/20024/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/08/2002 at 16:42:51. Contact: ###-####.
ELE02-00634 Final4/8/20024/9/20024/9/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/08/2002 at 16:42:51. Contact: ###-####.
ELE02-00324 Final4/9/20024/9/20024/9/2002 12:00:00 AMPPART
john ###-####. temporary occupancy.
roof-top hvac disconnects need paint removed for grounding lugs. 4/9/2002 3:10:25 PM
ELE99-03809 Final4/9/20024/9/20024/9/2002 12:00:00 AMPFAIL
CHRIS ###-####--key above front door. nec: article 100. readily accessible. no access panel for jetted-tub? 2 garage recepticle outlets wired incorrectly. posted. called contractor. 4/9/2002 2:21:56 PM
ELE02-00771 Electrical Rough-In4/9/20024/9/20024/9/2002 12:00:00 AMPPASS
for conf- harrold ###-####. clearances in equiptment room by service disconnects. 4/9/2002 3:33:03 PM