BLD02-00302
| BLD-Other | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
DEMO INSPECT ###-#### TOM
|
BLD02-00293
| BLD-Final | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | FAIL |
|
|
fn occ-re-insp -richard ###-####
c/n posted 4/9/2002 9:34:17 AM
|
BLD02-00473
| BLD-Footing | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 21:11:00. Contact: ###-####.
front and rear patio ftgs ok per plan 4/9/2002 10:21:51 AM
|
MEC02-00926
| Pressure Test | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 07:45:42. Contact: ###-####.
|
BLD01-03272
| BLD-Concrete | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PART |
|
|
tom ###-####
ok after electrical pass 4/9/2002 10:49:26 AM
|
BLD01-03272
| BLD-Concrete | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
tom ###-####
|
BLD02-00337
| BLD-Framing/Rough-in | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | NR |
|
|
re-inspect shear 4/8/2002 3:44:22 PM
|
BLD02-00793
| BLD-Conference | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
for conf- don- ###-####
conf. on foundation 4/9/2002 2:20:01 PM
|
BLD02-00293
| BLD-Final | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
temp. occ. ok untill tenant moves in, then we can look at aisle widths and ada on counter height, etc.(unless supervisor is ok w/ it now, all else ok) 4/9/2002 3:12:26 PM
|
BLD01-02565
| BLD-Energy code compliance | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PASS |
|
|
###-####- john energy code
|
BLD01-02944
| BLD-Conference | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 10:06:57. Contact: ###-####.
conf. on framing issues 4/9/2002 1:33:11 PM
|
BLD02-00715
| BLD-Framing/Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
fr gary ###-####
ok pending trades 4/9/2002 4:32:10 PM
|