MEC02-00927
| Final | 4/5/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 15:46:52. Contact: ###-####.
|
MEC02-00938
| Rough-in | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PART |
|
|
###-#### DERIC Pressure test failed--11lbs on 30 lb guage. 4/9/2002 9:18:53 AM
|
BLD01-02593
| BLD-Final | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 13:29:26. Contact: .
|
MEC01-03724
| Final | 4/8/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/08/2002 at 13:42:17. Contact: ###-####. door code 6210
|
BLD01-03153
| BLD-Final | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 07:27:54. Contact: . c. of c. #22181 issued. 4/9/2002 8:57:01 AM
|
MEC02-00954
| Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PASS |
|
|
###-####- ed r/i
|
BLD02-00609
| BLD-Foundation | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PART |
|
|
found wall- ###-####--mike wip--80% ready at time of inspection. 4/9/2002 1:09:19 PM
|
BLD01-03174
| BLD-Framing/Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | FAIL |
|
|
###-#### STEVE Energy not framing--completed insulation 4/9/2002 3:02:34 PM
|
BLD02-00673
| BLD-Footing | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | FAIL |
|
|
###-#### Setback not per approved plans. 4/9/2002 3:26:51 PM
|
MEC02-00283
| Final | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | FAIL |
|
|
###-#### greg 4444 enter for access in garage c/n--dryer vent buried in dirt, condensate line--where is the outside termination? Call for re-inspection. 4/9/2002 2:18:04 PM
|
MEC02-00960
| Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-00960
| Pressure Test | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | FAIL |
|
|
|
BLD01-03223
| BLD-Framing/Rough-in | 4/9/2002 | 4/9/2002 | 4/9/2002 12:00:00 AM | P | FAIL |
|
|
###-#### ALAN Interior shear--not per plans--blocking needed at seams then nailing .Do not mud / tape. 4/9/2002 1:33:51 PM
|