Inspections for the day of: Wednesday, April 9, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02906 BLD-Aging Inspection4/9/20034/9/20034/9/2003 12:00:00 AM CANC
this is a grading permit I do not inspect this. 4/9/2003 10:05:13 AM
BLD02-02661 BLD-Final4/8/20034/9/20034/9/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 4/8/2003 at 1:54:31 PM. Contact: ###-####.This needs life /safety , also new allarm plan. no inspection done needs to recall. 4/9/2003 10:20:52 AM
BLD03-00545 BLD-Final4/8/20034/9/20034/9/2003 12:00:00 AMACANC
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Called and told sam that fire/life safety has to approve first then recall for inspection structural. 4/9/2003 9:19:06 AM
BLD03-00700 BLD-Footing4/8/20034/9/20034/9/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2003 at 4:08:04 PM. Contact: ###-####.
BLD02-01073 BLD-Conference4/8/20034/9/20034/9/2003 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 4/8/2003 at 4:50:05 PM. Contact: ###-####.
BLD02-02573 BLD-Foundation4/8/20034/9/20034/9/2003 12:00:00 AMPFAIL
nike; Phone #: ###-#### Internet Inspection Request from: Annette Moore . The engineered structure has been built and has had no inspections. This should have had footing inspections as well all block poures. owner di work and showed me several pictures it would appear that work was done ok , But the block has ele out lets and conduit also a water line has been ran and a gas line and there were no permits for these items. I left a c/n to not cover any more work and obtain all required permits and inspections as a framing inspection could not be done. The permit will exp this month I told him I would allow another 60days. If this comes back please do not expire. 4/9/2003 4:57:55 PM
BLD02-01373 BLD-Framing/Rough-in4/8/20034/9/20034/9/2003 12:00:00 AMPFAIL
jim--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Posted a c/n . there are issues that need to be addressed with the shear and patio cover IE set backs, footing,nailing hold downs etc. I called contractor and told him I would need to meet him again with my supper visor George, as I do not want to keep coming back and leaving notices. With the siding re moved in some places it is appearant that it had not been nailed correctely,also there are no footings under porch and now with a string line the patio is would appear to be 6 in into set backs. 4/9/2003 4:52:33 PM
BLD03-00106 BLD-Final4/8/20034/9/20034/9/2003 12:00:00 AMPNR
They have failed the fire /life safety inspection and I will can not perform structural inspection untill this has been resolved. 4/9/2003 1:05:31 PM
BLD03-00592 BLD-Foundation4/9/20034/9/20034/9/2003 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
MEC03-00265 Final4/9/20034/9/20034/9/2003 12:00:00 AMPFAIL
###-####. NEED TO INSULATE ALL METAL IN CRAWL SPACE. CONTRACTOR ON SITE VERY ANGRY AS I WILL NOT APPROVE THIS, I SUGESTED THAT IF HE DID NOT LIKE THIS TO CALL OFFICE . i SHOULD CHARGE A RE- INSPECION FEE AS WORK IS TO BE READY. 4/9/2003 1:26:15 PM 4/9/2003 1:27:24 PM
BLD02-01073 BLD-Conference4/9/20034/9/20034/9/2003 12:00:00 AMPPART
would like you to meet architect at 1:30. 4/9/2003 10:04:17 AMArchitect on site went over requirements with him and contractor. If construction typ changed on town hose units will require a plan mod. 4/10/2003 10:28:51 AM