Inspections for the day of: Friday, April 9, 2004.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00543 INSP-Final Inspection4/8/20044/9/20044/9/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 4/8/2004 at 8:23:21 AM. Contact: ###-####. Need breaker lockout; updated maps with initiating devices; record of completion 4/9/2004 11:03:55 AM
FIR02-00460 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell PH. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
FIR02-00460 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell PH. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
FIR03-00808 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
FIR03-00808 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
FIR04-00200 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
FIR04-00200 INSP-Alarm Testing4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
Cell Ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
BLD04-00255 FIRE-Final Inspection4/8/20044/9/20044/9/2004 12:00:00 AMAPASS
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie No fire alarm work - no system in building; duct detectors for AHU shutdown were installed throughout the building under original tenant permit and tested okay 4/9/2004 9:05:07 AM
FIR04-00010 INSP-Final Inspection4/8/20044/9/20044/9/2004 12:00:00 AMAFAIL
Terry; Phone #: ###-#### please call first for access. Internet Inspection Request from: Aimee Hughes Extension given on temp occupancy for Mazzeh as the new alarm system isn't completed; tested the hood extinguishing system and it sent alarm signal to new panel; all of the water flows/tampers not connected to the new panel 4/9/2004 1:41:09 PM
BLD03-02811 FIRE-Final Inspection4/9/20044/9/20044/9/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 4/9/2004 at 6:13:35 AM. Contact: ###-####. door closures on stairs; floor covering; need to test the detectors for door release; expansion joint not installed 4/9/2004 9:29:41 AM
BLD04-00116 FIRE-Final Inspection4/9/20044/9/20044/9/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/9/2004 at 6:45:16 AM. Contact: ###-####. No fire alarm work or sprinkler work was required; the horn/strobe and heat detector were just replaced after the floor was replaced 4/9/2004 9:22:47 AM
FIR03-00770 INSP-Conference4/9/20044/9/20044/9/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 4/9/2004 at 8:47:30 AM. Contact: ###-####. Met with Patrick about some strobes needs in south aerobic room near vestibules 4/9/2004 2:52:07 PM
FIR03-00754 INSP-Alarm Testing4/9/20044/9/20044/9/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/9/2004 at 9:13:25 AM. Contact: ###-####.
FIR03-00668 INSP-Final Inspection4/9/20044/9/20044/9/2004 12:00:00 AMPPASS
UG has been flushed and hydro okay 4/9/2004 12:05:08 PM
FIR03-00734 INSP-Final Inspection4/8/20044/9/20044/9/2004 12:00:00 AMPPASS
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
FIR04-00123 INSP-Sprinkler Rough-in/Hydro4/8/20044/9/20044/9/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/8/2004 at 5:32:30 PM. Overhead hydro okay 4/9/2004 12:52:56 PM