PLM07-00460
| Final | 4/6/2007 | 4/9/2007 | 4/10/2007 1:35:25 PM | P | PASS |
|
|
please call at least a half hour priot to inspection--Ali ###-####
|
PLM05-04309
| Plumbing Rough-in | 4/9/2007 | 4/9/2007 | 4/9/2007 4:22:47 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 4/9/2007 at 10:17:40 AM. Contact: ###-####. not ready
|
PLM07-00613
| Final | 4/9/2007 | 4/9/2007 | 4/9/2007 4:20:51 PM | P | PASS |
|
|
CONTACT MIKE W Phone #: ###-####
|
PLM07-00967
| Final | 4/9/2007 | 4/9/2007 | 4/9/2007 1:27:55 PM | P | PASS |
|
|
Phone #: ###-####
|
PLM06-03003
| Final | 4/6/2007 | 4/9/2007 | 4/9/2007 10:38:01 AM | A | FAIL |
|
|
Hide a key under electrical box on SW corner of building in the back..key will open the front door Phone #: ###-#### need to have all backflow devices tested and certified. 2-provide identification for potable and non potable water in mechical room potable green back ground with white lettering non potable yellow background with white lettering 3- need to have all backflow valves permanently identified 4- need bee hive strainer in floor sink with approved grate 5- need expansion tank for water heater under break room sink cabnit .
|
PLM07-00246
| Plumbing Rough-in | 4/9/2007 | 4/9/2007 | 4/9/2007 9:20:29 AM | P | CANC |
|
|
Phone #: ###-#### Inspection cancelled from web by: raul castanon
|