FIR07-00156
| INSP-Alarm Testing | 4/6/2007 | 4/9/2007 | 4/10/2007 8:23:45 AM | P | FAIL |
|
|
Notification audibility in the mech equip. penthouse is below minimum dB allowed, provide an additional SD at the top of the hoistway due to beam obstruction, the firemans hat in the car must flash intermittently upon equipment room or hoistway FA device activation.
|
FIR07-00279
| INSP-Sprinkler Rough-in | 4/9/2007 | 4/9/2007 | 4/10/2007 8:16:10 AM | P | PASS |
|
|
Fire sprinkler demo permit work is complete.
|
FIR07-00253
| INSP-Sprinkler Rough-in/Hydro | 4/9/2007 | 4/9/2007 | 4/9/2007 3:19:40 PM | P | PART |
|
|
Fire sprinkler install is approved for cover as noted.
|
FIR07-00281
| INSP-Final Inspection | 4/9/2007 | 4/9/2007 | 4/9/2007 3:13:56 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR06-00742
| INSP-Final Inspection | 4/4/2007 | 4/9/2007 | 4/9/2007 12:32:21 PM | A | PART |
|
|
Okay for final when ceiling tile and escutcheons are complete.
|
FIR07-00253
| INSP-Sprinkler Rough-in/Hydro | 4/6/2007 | 4/9/2007 | 4/9/2007 10:29:00 AM | A | FAIL |
|
|
The modifications and installation must remain exposed for inspection prior to cover, need to remove ceiling tiles at affected areas, also need to provide approved plans on site as required.
|
FIR07-00281
| INSP-Alarm Testing | 4/6/2007 | 4/9/2007 | 4/9/2007 10:24:21 AM | A | PASS |
|
|
Fire alarm testing completed satisfactory.
|