Inspections for the day of: Wednesday, April 9, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00170 BLD-Framing/Rough-in4/9/20084/9/20084/9/2008 5:37:32 PMPCANC
tim - ceiling grid - please call prior to inspection so that he can meet you there Phone #: ###-####
BLD07-03156 BLD-Final4/9/20084/9/20084/9/2008 5:36:54 PMPPASS
jim Phone #: ###-####. ok for perm occ.
BLD06-03087 BLD-Conference4/9/20084/9/20084/9/2008 3:53:43 PMPCANC
BLD06-00057 BLD-Conference4/9/20084/9/20084/9/2008 3:50:43 PMPPASS
Spoke to George with Benchmark const. regarding this job. No new work is planned but maybee in near future. Noted to George that permit is about to expire. If no new work is going to take place in next 90 days, they may have to have scope of work modified to reflect what is completed at this time and resubmit new plans when remaining work can take place. Contractor siad he would call in a ceiling grid insp.
BLD08-00049 BLD-Footing4/9/20084/9/20084/9/2008 1:45:28 PMPPASS
matt Phone #: ###-####
MIS07-00216 MIS-Aging Inspection3/26/20084/9/20084/9/2008 12:51:44 PMANR
BLD08-00125 BLD-Framing/Rough-in4/8/20084/9/20084/9/2008 11:16:24 AMAPASS
randy Phone #: ###-####. interior wood framed walls ok. Also went over other requirements for E occ with contractor and all red lined items. Also noted to contraxctor that shell and core not finaled.
BLD08-00065 BLD-Aging Inspection4/9/20084/9/20084/9/2008 10:49:57 AM DONE
BLD08-00065 DOC - Permit Finaled4/9/20084/9/20084/9/2008 10:49:49 AMPPASS
BLD07-02935 BLD-Energy code compliance4/8/20084/9/20084/9/2008 10:41:51 AMAPASS
gary Phone #: ###-####
BLD08-00434 BLD-Framing/Rough-in4/8/20084/9/20084/9/2008 9:56:51 AMAPASS
Bruce Phone #: ###-#### Interior steel stud framed walls for new changing rooms on 1st. floor at womens accessories.
BLD08-00280 BLD-Energy code compliance4/8/20084/9/20084/9/2008 9:29:49 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2008 at 7:31:11 PM. Contact: ###-####.
BLD08-00280 BLD-Framing/Rough-in4/8/20084/9/20084/9/2008 9:29:36 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2008 at 7:30:35 PM. Contact: ###-####. Interior framed walls and hardlid only. no grid.
BLD08-00281 BLD-Energy code compliance4/8/20084/9/20084/9/2008 9:22:09 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2008 at 7:29:08 PM. Contact: ###-####.
BLD08-00281 BLD-Framing/Rough-in4/8/20084/9/20084/9/2008 9:21:54 AMAPASS
Scheduled by a contractor via Hello! on 4/8/2008 at 7:28:33 PM. Contact: ###-####. Interior steel stud framed walls and hardlid only. no grid.
BLD07-02196 BLD-Energy code compliance4/8/20084/9/20084/9/2008 8:56:32 AMAPASS
Bill Phone #: ###-####