ESC07-01555
| Tracking Control | 4/9/2008 | 4/9/2008 | 4/9/2008 4:32:28 PM | P | FAIL |
|
|
Heavy amounts of sediment in the Gutter pan infront of lot. Left a message with the Rp oever the issue. CAS #460
|
ESC06-00958
| Site Final | 4/9/2008 | 4/9/2008 | 4/9/2008 3:56:28 PM | P | PASS |
|
|
Stabilized
|
ESC08-00086
| Tracking Control | 4/9/2008 | 4/9/2008 | 4/9/2008 3:42:57 PM | P | PART |
|
|
Minor tracking off of project. RP said it will be cleaned up by tomorrow. Site is looking good.
|
ESC08-00253
| Site Preparation | 4/8/2008 | 4/9/2008 | 4/9/2008 2:29:24 PM | P | PASS |
|
|
Site looks good. Where they are dewatering is good. Water is clean. No sediment is being picked up through the flow channel that has been constructed.
|
ESC07-01192
| Tracking Control | 4/8/2008 | 4/9/2008 | 4/9/2008 1:30:57 PM | A | FAIL |
|
|
Heavy amounts of sediment on parking lot still. Talk with Project Manager. Will be cleaned by tomorrow. CAS #460
|
ESC07-01571
| Tracking Control | 4/8/2008 | 4/9/2008 | 4/9/2008 1:30:41 PM | A | FAIL |
|
|
Heavy amounts of sediment on parking lot still. Talk with Project Manager. Will be cleaned by tomorrow. CAS #460
|
ESC05-01025
| Complaint Inspection | 4/8/2008 | 4/9/2008 | 4/9/2008 12:53:42 PM | A | FAIL |
|
|
Notice of Correction Stabilize disturbed soil on area that will and hes been sitting for 30 days. Remove or contain spoil piles (concrete&asphalt). Will re-inspect on 5-9-08 to check on stabilization. CAS#460
|
ESC08-00178
| Site Preparation | 4/8/2008 | 4/9/2008 | 4/9/2008 11:49:51 AM | A | FAIL |
|
|
No work has started. Will not for a while. CAS #460
|