FIR09-00068
| INSP-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 4:33:21 PM | P | PASS |
|
|
Corrections field verified, as-builts okayed, EOL voltage drop is acceptable, fire alarm permit finaled.
|
BLD09-00157
| FIRE-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 4:31:49 PM | P | FAIL |
|
|
See circled notes on fire code review including items related to high piled storage, door hardware, need to test new exit signs and EM lights, missing box and cover at the electrical service breaker panel.
|
FIR08-00839
| FIR-Aging Inspection | 4/9/2009 | 4/9/2009 | 4/9/2009 3:41:01 PM | | DONE |
|
|
Work in progress, construction underway.
|
BLD06-02303
| FIRE-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 3:38:07 PM | P | NR |
|
|
Regarding backup power source requirements.
|
FIR09-00028
| INSP-Final Inspection | 4/9/2009 | 4/9/2009 | 4/9/2009 3:33:26 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
BLD08-01848
| FIRE-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 3:32:33 PM | A | FAIL |
|
|
Need to post max. occupant load sign per review notes, provide the fire extinguisher at location on wall per plan, relocate one exit sign at the SE corridor away from the horn strobe.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 4/9/2009 | 4/9/2009 | 4/9/2009 3:28:29 PM | A | FAIL |
|
|
See red line notes on new approved plan set for locations on the 3rd, 4th, and 5th floors in need of correction.
|
FIR09-00028
| INSP-Alarm Testing | 4/8/2009 | 4/9/2009 | 4/9/2009 3:23:54 PM | A | PASS |
|
|
Fire alarm work passed field testing, permit finaled.
|