Inspections for the day of: Thursday, April 9, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00096 INSP-Alarm Testing4/9/20094/9/20094/9/2009 4:12:29 PMPPASS
This inspection was a fire alarm rough-in on the first and second floors which passed. The horns on all floors of this building have been relocated to meet the requirements of NFPA 72.
FIR09-00133 INSP-Sprinkler Rough-in4/9/20094/9/20094/9/2009 4:10:54 PMPPART
Todays inspection was for cover under the stairs, which it can be, but brian and I also did a rough-in on the wet system. I found one upright sprinkler head that needs to be relocated away from a 2x4 and one upright that needs to be added as shown on the plans. Also not all heads and lines were installed. These items will be checked when the hydro tests are called in.
FIR08-00841 INSP-Sprinkler Rough-in/Hydro4/9/20094/9/20094/9/2009 2:39:50 PMPPASS
The overhead hydro test passed.
FIR09-00125 INSP-Sprinkler Rough-in/Hydro4/9/20094/9/20094/9/2009 1:54:26 PMPPASS
The overhead hydro test passed.
FIR08-00841 INSP-Sprinkler Rough-in/Hydro4/7/20094/9/20094/9/2009 12:59:00 PMAPART
The overhead hydro test failed but the overhead sprinkler piping can be covered. The overhead hydro is set back up for this afternoon.
BLD08-02435 FIRE-Final Inspection4/8/20094/9/20094/9/2009 11:55:30 AMAFAIL
don Phone #: ###-#### or ###-#### Provide the correct address as discussed and remove the door between the common bathroom corridor and the Office 120/future tenant as per the approved plans. The owner disagreed with both items. I got the direct line for addressing to have him call Chris and I also left a message on Tims Woodards phone about the door. There was nothing more I could do so I left a correction notice.