FIR09-00312
| INSP-Final Inspection | 4/9/2010 | 4/9/2010 | 4/9/2010 3:07:58 PM | P | PASS |
|
|
permit finaled
|
FIR09-00535
| INSP-Conference | 4/9/2010 | 4/9/2010 | 4/9/2010 1:37:59 PM | P | DONE |
|
|
Me, Mark Sentenno and Tim Frost met with Jeff Pacham with Treasure Valley Fire and two representatives of Chevron, Lloyd and Steve and discussed outstanding issues from the last inspection. The tamper switches will be replace with devices that comply with NFPA 72, the pump and related electrical wiring needs to be above the water line (doors are ok for drainage). Tim is researching the required ventilation. The other items will be owner or fire sprinkler contractor supplied.
|
FIR10-00001
| INSP-Final Inspection | 4/8/2010 | 4/9/2010 | 4/9/2010 12:30:05 PM | A | CANC |
|
|
Cancel per Rick
|
FIR10-00018
| INSP-Sprinkler Rough-in/Hydro | 4/8/2010 | 4/9/2010 | 4/9/2010 12:27:43 PM | A | PASS |
|
|
The overhead hydro test passed.
|