FIR12-00550
| INSP-Sprinkler Rough-in | 4/9/2013 | 4/9/2013 | 4/12/2013 6:48:06 AM | A | PART |
|
|
Phase one okay
|
BLD12-02734
| FIRE-Final Inspection | 4/9/2013 | 4/9/2013 | 4/9/2013 2:56:49 PM | P | PASS |
|
|
Life safety inspection passed with the exception of one item- plan note #8 on sheet A1.2 must be provided prior to occupancy. Contractor to post fire extinguisher as discussed.
|
FIR13-00136
| INSP-Sprinkler Rough-in | 4/9/2013 | 4/9/2013 | 4/9/2013 2:52:41 PM | A | PART |
|
|
Okayed for cover, final pending ceiling tile and escutcheons. GC to verify existing system is current with an annual inspection.
|
BLD13-00090
| FIRE-Final Inspection | 4/8/2013 | 4/9/2013 | 4/9/2013 2:49:21 PM | A | PASS |
|
|
Scope of work completed. Fire life safety final approved.
|