Inspections for the day of: Tuesday, April 9, 2013.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00474 FIR-Aging Inspection4/9/20134/9/20134/10/2013 7:28:43 AM NR
Jeff is going to follow up on job status per phone conversation.
FIR13-00125 INSP-Final Inspection4/9/20134/9/20134/9/2013 3:50:12 PMPPASS
Permit finaled
FIR13-00020 INSP-Sprinkler Rough-in4/9/20134/9/20134/9/2013 3:36:37 PMPCANC
Per lonny to be canceled Phone #: ###-####
FIR13-00074 INSP-Sprinkler Rough-in4/9/20134/9/20134/9/2013 3:24:29 PMPPART
The 2nd floor sprinkler piping can be covered. I noted one location where the pendant head is too close to a wall and another where a pendant head is overspaced in a office.
BLD12-02452 FIRE-Final Inspection4/8/20134/9/20134/9/2013 2:45:25 PMAPASS
Life safety passed. Sam in plan review was going to verify that the lever/thumbturn type locks on the ADA pocket doors is code compliant prior to the building inspection.
BLD13-00765 FIRE-Final Inspection4/8/20134/9/20134/9/2013 2:43:42 PMPFAIL
Provide for annual inspection for the fire extinguisher and provide single action hardware for the front door as discussed.
BLD12-00321 FIRE-Final Inspection4/8/20134/9/20134/9/2013 12:46:24 PMAFAIL
Provide fire dept. plan review comments, provide additional fire extinguisher at the car wash and on the mezzanine, provide exit discharge light at the main showroom exit (the one installed is too far away), remove exit sign at the east showroom exit per the approved plans, provide emergency lighting in the showroom entry vestible, repair non-functioning emergency lights and exit signs, provide final inspections for the fire sprinkler permits.
FIR12-00574 INSP-Final Inspection4/8/20134/9/20134/9/2013 12:43:13 PMAFAIL
The forward flush test failed and the plan modifications are not on site.
FIR12-00493 INSP-Final Inspection4/8/20134/9/20134/9/2013 12:14:12 PMAPASS
Permit finaled