Inspections for the day of: Wednesday, April 9, 2014.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00230 General Inspection4/9/20144/9/20144/9/2014 11:23:17 AM PASS
Lots of activity on Brighton Homes projects. No major issues but end of day clean up will need to be maintained. No trackout outside of development. Permits posted, stormdrain structures are protected. Approved for now.
ESC13-01279 General Inspection4/9/20144/9/20144/9/2014 11:13:19 AM PASS
No significant trackout onto Ekhart. Grading and grubbing to the north of the wetland area has begun. No corrections at this time.
ESC13-00642 Aging Inspection4/9/20144/9/20144/9/2014 11:01:13 AM FAIL
Verbal warnig to RP to clean up non-compliant washout across Old Hickory. Will re-inspect at the end of the week. Inspection scheduled.
ESC13-00639 Aging Inspection4/9/20144/9/20144/9/2014 10:59:27 AM PASS
Landscaping in progress. Not quite ready to be finaled. No corrections at this time.
ESC13-00644 Aging Inspection4/9/20144/9/20144/9/2014 10:57:04 AM PASS
Finaled.
ESC13-00644 DOC - Permit Finaled4/9/20144/9/20144/9/2014 10:56:49 AMPPASS
Will be landscaped at end of day. All permits finaled. No further ESC inspections required.
ESC13-00645 Aging Inspection4/9/20144/9/20144/9/2014 10:55:26 AM PASS
Finaled.
ESC13-00645 DOC - Permit Finaled4/9/20144/9/20144/9/2014 10:55:13 AMPPASS
House complete and landscaped. ESC conditions satisfied.
ESC13-00635 Aging Inspection4/9/20144/9/20144/9/2014 10:43:19 AM PASS
No changes since prior inspection. Awaiting landscaping. No corrections required.
ESC14-00195 Site Preparation4/8/20144/9/20144/9/2014 10:38:26 AMAPASS
john Phone #: ###-####

Permit posted. Homes under construction on both sides of parcel. RP John Seidl had all approaches to Seidl Homes' projects on Barber swept. No corrections required. Approved.
ESC14-00086 Site Preparation4/8/20144/9/20144/9/2014 9:48:46 AMAPASS
site prep - Village Chaton grading and sub development permit. Phone request by Jim with Andrersen Construction ###-####. 9 AM

Attended project pre-con meeting and was able to discuss the SWPPP with Andersen Construction and Knife River.

BMPs include:
1. DI protect
2. 60'x18' rock construction entrance (no fabric for this temporary phase.
3. Perimeter wattles
4. Undisturbed vegetative strip along sidewalk

Permit posted, SWPPP onsite. I will retain construction schedule. Approved.