ELE13-00539
| ELE-Aging Inspection | 4/9/2015 | 4/9/2015 | 4/10/2015 12:37:04 PM | | DONE |
|
|
needed final did drive by
|
ELE15-00968
| Rough-In Permanent Service | 4/9/2015 | 4/9/2015 | 4/9/2015 3:28:26 PM | P | NH |
|
|
call ###-#### for access Phone #: ###-#### Inspection requested via web by David Nelson no answer on phone for access
|
ELE15-00055
| Electrical Rough-In | 4/9/2015 | 4/9/2015 | 4/9/2015 3:08:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton t bar ceilings ok to cover
|
ELE14-03246
| Electrical Rough-In | 4/9/2015 | 4/9/2015 | 4/9/2015 2:39:58 PM | P | PASS |
|
|
Tower 2 Stairwell #1. Tower #2 Podium. Phone #: ###-#### Inspection requested via web by Sean DeLacy tower 4 podium level rms. 200 thru 205, elevator lobbys level 2 thru 5 and stairwell #1 r/i ok
|
ELE15-00976
| Conference | 4/9/2015 | 4/9/2015 | 4/9/2015 1:10:16 PM | P | DONE |
|
|
Mike Phone #: ###-#### discuss extent of wiring re remodel. Ok to reuse existing where wire is ok. install AFCI to bdrms. and smoke detectors
|
ELE15-00740
| Electrical Rough-In | 4/9/2015 | 4/9/2015 | 4/9/2015 12:32:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton u.ground secondary and telco
|
ELE15-00655
| Final | 4/8/2015 | 4/9/2015 | 4/9/2015 10:45:08 AM | A | PASS |
|
|
Builder will be there. Name is Orion. Any questions please call me Dustin @ ###-#### Phone #: ###-#### Inspection requested via web by Dustin Kuester final ok
|
ELE14-03333
| Electrical Rough-In | 4/8/2015 | 4/9/2015 | 4/9/2015 10:07:28 AM | A | PASS |
|
|
Contact name will be Jeremy Thornock Thank you Phone #: ###-#### Inspection requested via web by Deb Gooden 3rd flr wing 1 corridor soffits ok
|
GCE15-00006
| GCE-Final | 4/8/2015 | 4/9/2015 | 4/9/2015 9:11:15 AM | A | FAIL |
|
|
Darren ###-#### - code: 3255 broken switch plate on attic light. 210.12(A)- upst. east bdrms. not on AFCI breaker
|
GCE15-00054
| GCE-Rough-In | 4/8/2015 | 4/9/2015 | 4/9/2015 8:21:48 AM | A | PASS |
|
|
Zane ###-#### - underground insp. r/i u. ground to 2 signs ok. NOTE: Still need to see 2nd temp. pole after installation is complete.
|