Inspections for the day of: Thursday, April 9, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00356 General Inspection4/9/20154/9/20154/9/2015 4:39:14 PMPPASS
Dirt offhauling is finished for time being. Work is occuring to prep for foundation. No trackout, permit posted, construction entrance and sediment control BMPs are installed on stormwater infrastructurs (swale onsite, inlet on street)

Approved, no corrections necessary at this time.
ESC14-00759 General Inspection4/8/20154/9/20154/9/2015 4:35:08 PMAPASS
Work is occuring on the interior. Foundation and frame work is complete. The hillside behind house has silt fence installed and vegetation has been preserved. Trash container onsite, no trackout, discharges/spills observed. Apprvoed.
ESC15-00210 Site Preparation4/9/20154/9/20154/9/2015 4:29:27 PMPCANC
rescheduled for tomorrow. Requested that permit be posted and hillside BMPs be installed.
ESC13-00213 General Inspection4/9/20154/9/20154/9/2015 4:27:50 PM PEND
Work occuring to fix house plumbing issues. Some minor trackout needs to be swept. Need to determine who the new RP/GC for construciton is.
ESC13-00230 General Inspection4/9/20154/9/20154/9/2015 3:51:00 PM PASS
WIP. River Heights 5 BMPs are installed. No major trackout. Landscapers are applying bark chips/mulch on areas between sidewalk and sweeping up loose bark from the road as I was on site.

Approved. About 70% lots are now built out.
ESC14-00909 DOC - Permit Finaled4/9/20154/9/20154/9/2015 3:48:57 PMPPASS
Home complete, occupied, and landscaped. All other permits finaled. ESC conditions satisfied.
ESC14-01013 Aging Inspection4/9/20154/9/20154/9/2015 3:35:35 PM PASS
Construction complete. No disturbed area at site. All loose sediment and materials cleaned. ESC permit finaled.
ESC14-01013 DOC - Permit Finaled4/9/20154/9/20154/9/2015 3:34:54 PMPPASS
ESC15-00332 Site Preparation4/9/20154/9/20154/9/2015 3:32:13 PMPPASS
New SFH to start Friday 4/10 in Tianna Park, check BMPs

Clear to start excavation tomorrow AM. No issues in Tianna Park - permit to be posted upon arrival of excavator. BMPs installed.
ESC14-01018 Aging Inspection4/9/20154/9/20154/9/2015 2:44:39 PM PASS
Garage addition complete. No construction acitivity or loose sediment at site. ESC permit finaled.
ESC14-01018 DOC - Permit Finaled4/9/20154/9/20154/9/2015 2:44:03 PMPPASS
ESC15-00299 Site Preparation4/8/20154/9/20154/9/2015 2:34:52 PMPPART
Dan Phone #: ###-####

New lined concrete washout provided for Dunham Commons as requested. DI's have protection

Correction at site needed:
Install wattle along east property line to protect the drainage swale. Will check back for installation on Monday.
ESC14-00962 General Inspection4/8/20154/9/20154/9/2015 1:43:33 PMPPASS
Paramedic station remodel/renovation is in progress. Earthwork and foundation are complete. Gutters surrounding site are free of loose sediment from the site. No windblown trash or nonstormwater discharges observed. Approved.
ESC13-01167 General Inspection4/9/20154/9/20154/9/2015 12:35:37 PM PASS
Final landscaping and hillside stabilization are in progress. Home is complete and occupied. No corrections at this time.
ESC11-00192 General Inspection4/9/20154/9/20154/9/2015 12:05:14 PM PASS
Individual homes in progress. No subdivision BMP corrections needed.

Investigating dirt stockpiles being stored at the end of Ridgeline
ESC13-00193 General Inspection4/8/20154/9/20154/9/2015 11:42:34 AMPPART
Perimeter wattles, silt fence, and hillside vegetation has kept sediment on site. Culdesac is clean. No further washouts have occurred on open parcels. No individual homes in progress yet.

Need to clean up dried washout and empty top inlet off Crestline.
ESC14-00281 DOC - Permit Finaled4/9/20154/9/20154/9/2015 11:28:51 AMPPASS
Home is complete, landscaped, and surrounding sidewalks/gutters have been cleaned. BLD permit final pending zoning; ESC permit conditions satisfied.
ESC14-00333 General Inspection4/9/20154/9/20154/9/2015 9:21:26 AM PASS
ESC14-00273 General Inspection4/9/20154/9/20154/9/2015 8:49:00 AM PASS
ESC14-00418 General Inspection4/9/20154/9/20154/9/2015 8:45:51 AM PASS
Retaining walls installed. Landscaping ongoing. Not yet full stabilization. No corrections at this time.