FIR19-00815
| INSP-Sprinkler Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 3:08:49 PM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered. Re-inspection, as built is approved, FDC relocated. Please call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00171
| INSP-Sprinkler Rough-in | 4/9/2020 | 4/9/2020 | 4/9/2020 1:59:41 PM | P | PASS |
|
|
Rough-in passed. Piping ok for cover. Heads at the new overhead door not complete yet.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
GRD18-00092
| FIRE-Final Inspection | 4/9/2020 | 4/9/2020 | 4/9/2020 12:40:05 PM | A | PASS |
|
|
Life safety passed.
|
FIR19-00769
| INSP-Final Inspection | 4/2/2020 | 4/9/2020 | 4/9/2020 11:12:24 AM | P | FAIL |
|
|
Total trip time was 1:55, it can not exceed 60 seconds. Also need ceiling and pendant installed in the Data Room.
Please call Jim Lewis if you have any questions he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
FIR19-00769
| INSP-Sprinkler Rough-in | 4/8/2020 | 4/9/2020 | 4/9/2020 10:01:29 AM | A | PASS |
|
|
24 hour air test witnessed with no pressure loss. Please give a Jim Lewis a call for inspection time. Phone #: ###-#### Inspection requested via web by Joshua Hansen
|
FIR19-00894
| INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 10:01:00 AM | A | PASS |
|
|
The underground hydro test was witnessed with no pressure loss.
Phone #: ###-#### Inspection requested via web by Sam Ball
|