BLD00-00432
| BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | A | FAIL |
|
|
Corrections ok, except winder stairs not per detail.
|
BLD99-03720
| BLD-Other | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | A | NH |
|
|
No one there, left C/N to recall.
|
BLD00-00995
| BLD-Footing | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | A | PART |
|
|
OK except steel not in place.
|
BLD00-00494
| BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | A | FAIL |
|
|
Need engineers calcs and clean plans. Also noted corrections with wall to roof connections.
|
BLD00-01023
| BLD-Footing | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | A | FAIL |
|
|
No plans on site, reinforcement requires clearance from earth, C/N given to concrete workers.
|
BLD00-00902
| BLD-Conference | 4/28/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 09:34:46. Contact: ###-####.
|
MEC00-01361
| Final | 4/28/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 13:43:45. Contact: ###-####. not ready
|
MEC00-00814
| Final | 4/28/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 14:26:06. Contact: . need fresh air connected at furnace no return air from kitchen
|
BLD00-00664
| BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | P | FAIL |
|
|
###-#### shear nail. No approved plans/also engineering may not match. Left C/N posted.
|
BLD00-00717
| BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 12:00:00 AM | P | PASS |
|
|
###-####. Ok to side/left correction for upper floor posted on window.
|