PLM00-03836
| Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 12:05:47. Contact: ###-####. northwest corner storefront door or ###-#### for access add hangers 5/1/2001 4:14:39 PM
|
PLM01-01322
| Water and/or Sewer | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-00795
| Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
gene ###-####
|
PLM01-00796
| Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Gene ###-####
|
PLM01-00579
| Water and/or Sewer | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
waterline added Raul ###-####
|
PLM01-00578
| Water and/or Sewer | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
raul ###-#### water line ok 5/1/2001 4:13:56 PM
|
PLM01-01340
| Storm Drains | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PART |
|
|
storm drains only at this time Jim ###-#### still needs test 5/1/2001 4:16:58 PM
|
PLM01-01349
| Sprinkler (Final) | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | FAIL |
|
|
###-####Gary late as possible
|
PLM01-01351
| Sprinkler (Final) | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | FAIL |
|
|
Gary ###-#### relocate system valves 5/1/2001 4:16:34 PM
|