BLD01-00265
| BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 10:22:01. Contact: ###-####. unable to locate contractor. left message to call me. 12/2/2001 2:55:37 PM
|
MEC01-00592
| Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Air Care ###-####
|
BLD00-02809
| BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PART |
|
|
TIM ###-#### FR ok to cover ext walls only,needs ele before frame insp. 12/2/2001 9:20:09 AM
|
BLD01-00139
| BLD-Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 14:27:51. Contact: ###-####. ok temp oc only needs penetrations in corridor sealed. 12/2/2001 9:20:40 AM
|
MIS01-00068
| BLD-Conference | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PART |
|
|
Barbara ###-#### please call to make an appointment. spoke with architect,an inspection has already been done for this mis permit, now need to resolve those items. 12/2/2001 9:26:44 AM
|
BLD00-03194
| BLD-Footing | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 10:59:20. Contact: .ok subject to s-i. 12/2/2001 9:27:07 AM
|
BLD00-03420
| BLD-Final | 4/30/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 15:49:53. Contact: ###-####.needs hand rail lowered and smoke detectors. 12/2/2001 9:29:00 AM
|