BLD00-03047
| FIRE-Final Inspection | 4/27/2001 | 5/1/2001 | 5/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 4/27/2001 3:21:22 PM
|
BLD01-00428
| FIRE-Final Inspection | 5/1/2001 | 5/1/2001 | 5/2/2001 12:00:00 AM | P | FAIL |
|
|
###-#### fire sprinkler r/i inspection 5/2/2001 9:54:31 AM
|
BLD01-00141
| FIRE-Final Inspection | 5/1/2001 | 5/1/2001 | 5/1/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 07:13:49. Contact: ###-####.
|